Wong: Over half of utility study time goes to cleaning data
“So studies today, I would say half if not more of the time, especially for distribution, is on cleaning up data.”
Wong: Transmission interconnection studies take 6-9 months and cost $250K
“I think most utilities are talking about six to nine months to perform one of those studies, and it's a one-time, right, so risk of restudies will compound that, and it does cost internal utility, typically a hundred, A couple of 100,000 dollars. The typical b…”
Chamath: The single biggest dollar short will be electric utilities
“I think the single biggest dollar short, it's not clear when, that one will be able to make, will be on these utilities, because if any version of what we just talked about happens, And all of a sudden, you have private homeowners that are their own utility, a…”
Virtual power plants will soon bridge grid capacity for large data centers
“So it does take some work to get it, and you're right, no one's done it at a, at any real scale yet but I think we're gonna see it pretty soon.”
Engstrom: Utilities will increasingly adopt device-specific rates for heat pumps and batteries
“We will see a more abundance of technology-specific rates. I'm thinking about heat pumps, batteries. Certainly we have EV rates are quite ubiquitous at this point.”
Shah: Virtual power plants must be opt-out and fully automated to scale
“One, Everything needs to be opt out. This notion that we need to spend 700 dollars to, like, talk to people and beg them to opt into something is looney tunes. Like, when you hook up something, it's automatically opted into a VPP, and then we should give you a…”
Faruqi: Utilities do not need pilots given 400 existing global trials
“Let's try to actually move to actual implementation, and my advice is you don't really need to do a pilot because we already have 400 pilots across the globe.”
Shah: Full VPP software integration costs roughly $35 million per utility
“Our estimates is that this would cost roughly thirty-five million dollars per utility to put all the software layers in place from the venture-backed companies that have created them to be able to, you know, actually fully integrate this whole suite, right?”
Janis: Utility Capacity Shortages Are Usually Peak-Hour Issues, Not Year-Round
“Because the thing that I think people that work in this industry understand, but most people don't understand, is when a utility says that they don't have power, they don't mean that most of the time there's not power. They just mean there might be a handful o…”
Rayford Smith: AI's lack of explainability hinders regulatory approval in utilities
“One of the areas that's challenging is the explainability of it. When you're training these models, you're trying to get them to do what they do, and then they go make decisions. It's really hard to kind of backtrace, like, why did you make decision X versus w…”
Melanson: Grid activity is inverting from bulk generation to edge infrastructure
“Historically, the action and the money and the competition was at the bulk part of the system, and so the last mile was sort of the sleepy last mile infrastructure. That's about to invert, where you have all this activity, you have mobile batteries, you have e…”
Cook: Only 30% of utility distribution systems are currently fully modeled
“Now I would say 10 years ago, there's probably like 10%. I think we're probably maybe, you know, up to 30% of the systems that are fully built in the distribution.”
Cook: Most electric utilities lack secondary grid topology mapping
“Not many utilities have their secondary modeled. Not many utilities know exactly which customers are connected to which transformer and which transformer is connected To which circuit, and which circuit is connected to which substation.”
Shah: 20 nuclear orders will come in by 2025 or 2026
“And the goal, I think, is by 20, 25, 26, right, when OPG is in full construction for there to be 20 orders that come in, right, and I think I think once that happens, then I think all the electric utilities will come very quickly, because they have a huge amou…”
Gramlich: Utilities resist cheap grid tech because it hurts rate base returns
“Our utilities love their capital in the rate base. They don't love quite so much cheap things that can solve problems without a lot of capital in the rate base. So that's the problem with grid enhancing technologies.”
Morris: Building chatbot tool for electric utilities to configure DER software
“My, I was on the line with my CTO the other day, and we are now making a tool so that some of our customers, which are these electric utilities, Can use chatbots to configure software that lets them communicate with DER and procure services from them.”
Atkinson: High solar saturation in Hawaii and Australia causes utility pushback and installation limits
“One of the things that we've seen go into place in places like Hawaii and Australia, where this is also an issue, is that you'll start to see limitations on how much solar can go in, whether that's limiting new installs or limiting the size of the install. You…”
Atkinson: Traditional utility demand response relied on manual phone calls to large customers
“Most utilities have had some form of demand response program in place for, you know, 10, 2030 years, but typically up until now they were really only participated in by very, very large customers because the mechanism actually was calling people on the phone t…”
Powell: US utilities view rooftop solar as a threat, creating hurdles
“In the United States, very much so in many jurisdictions throughout the country, certainly in the utility space, it's seen as a threat, not an opportunity, and so when you see it that way, there's more and more hurdles that get created to go through for a cust…”
Russo: Open-Ended Wildfire Liability Is 'Game Over' for Electric Utilities
“You also have the prospects of PG&E where there's a generalized belief that it'd be a nice thing if there's a forest fire to have the utility take on all of the liability of consequential damages after a fire. So long as their power station was responsible for…”
Public Utility Market Sentiment Guides Private Infrastructure Asset Sales
“It's interesting because I think the listed view is quite valuable in sentiment, and so often in talking with the CIO, my key question to him is, what's your sentiment right now? Because it gives some test of where exuberance is or isn't in some of the sectors…”