Prediction Not checkable as stated
Behind-the-meter nuclear data centers have no credible case for decades
“I don't think there's a credible argument for behind the meter nuclear at a data center in the near future. And by near future, I mean, The next couple of decades.”
Prediction Not checkable as stated
Janous: US data center constraints will persist through 2030 and beyond
“All the stuff we thought we were going to build in this country, or thought we could build, a lot of that's not going to get built, because of all the things we've just been talking about. Like, I think that, and this problem is going to persist for the forese…”
Prediction Not checkable as stated
Janous: Vast majority of computation will remain in 100MW+ data centers
“I still believe that the vast majority of the computation is going to be done in large data centers. Large being defined as hundred megawatts or more in my world.”
Assertion Partly supported
Solar and batteries have killed Texas's $9,000 per megawatt-hour price spikes
“The only argument, you know, you ever had for building something like a baseload generator in Texas is that sometimes the price would go to 5000 or 9000 dollars a megawatt hour, but with the massive amounts of solar and storage coming out of the grid, which yo…”
Opinion
Janous: Traditional colocation data centers lack the energy talent for AI.
“And those companies that, that filled the gap in the last era are really not particularly well equipped, equipped to fill it in this era because the depth of energy talent at those companies is actually quite thin.”
Prediction Not checkable as stated
Janous: Compute demand will exceed available power supply through 2030.
“It's possible, though I suspect that given the, my fundamental belief is that the demand for compute, let's just say through twenty-thirty, will exceed the available power in the market. And therefore, the marginal value of the next watt or gigawatt, frankly, …”
Prediction Open · timeframe Jun 2034
Janus: AEP will not connect 90 gigawatts in next decade
“There's no reason to believe that AEP is going to connect 90 gigawatts in the next 10 years.”
Prediction Not checkable as stated
Janus: AI Training Loads Will Not Run as Intermittent Renewable-Following Workloads
“So I think it's a little bit overblown to say, and I think this is also true of Something like the conversation around crypto, but that these are highly curtailable loads that you could just, you know, attach a training model to a wind farm and only run it, yo…”
Opinion
Janus: Powering Gigawatt-Scale Data Centers with Solar and Storage Is Not Feasible
“You're not going to put solar in storage to supply a 500 to gigawatt, 500 megawatt to gigawatt scale data center. I mean, it's just not feasible.”
Prediction Not checkable as stated
Janus: Nuclear Power Will Not Solve Data Center Bottlenecks This Decade
“The focus that these companies have right now is getting data centers online in the next, Two, three, four years, and nuclear is not going to solve that problem.”
Prediction Not checkable as stated
Janus: Hyperscaler climate targets are probably not achievable on time
“And so there is, I think at this point, a point of coming to grips with the fact that those targets are probably not achievable in the time horizons that they had all set.”
Opinion
Janus: Hyperscalers have deprioritized day-one clean power for immediate grid capacity
“You know, if you go back a few years, you know, zero carbon energy day one was really becoming a non-negotiable that, you know, we wanted energy, wanted to be zero carbon. We wanted to have it Done, ready to go when we plug in the data center. I think the, pro…”
Insight
Janus: Chip efficiency gains will not reduce AI data center power demand
“If let's say Meta, for instance, finds a piece of land or a point on the grid where they can pull three gigawatts, Of power on one location. And then the next day, NVIDIA comes out with a chip that's twice as efficient. Is Meta going to build a 1.5 gigawatt da…”
Assertion Not checkable as stated
Janous: Data centers use little water compared to agriculture and golf courses
“And if you look at the actual facts, like, data centers do not use that much water relative to, you know, fill in the blank, almonds, avocados, golf courses, you know, so.”
Opinion
Janous: Tech companies' presentation of AI is driving data center backlash
“So I do think the, you know, the tech companies have, you A real issue around how AI has been presented, you know, and that is causing a lot of this backlash as well.”
Assertion Not checkable as stated
Janous: GE Vernova builds 2.6 GW capacity for one-gigawatt data center
“In fact, I was talking to Someone from GE Vernova yesterday, and he was talking about for this gigawatt data center, they're having to build 2.6 gigawatts of capacity across generation and batteries and everything else.”
Opinion
Janous: On-site power plants make data center community backlash worse
“Do they really want a data center plus a power plant next door? That also seems like not the right solution. Like, I think that's, Worse than a data center connected to the grid.”
Insight
Janous: Taking data centers off-grid prevents broader electricity rates from decreasing
“It's fine micro, but I would even say, I mean, if you believe that a larger denominator is actually good for lowering electricity rates over time, it's actually negative in that you're taking that denominator off the grid.”
Assertion Not checkable as stated
Off-grid Texas data centers pay up to 10x more for electricity
“If you look at it in a place like Texas, for instance, where the average price for electricity on any given day is actually pretty low. Like the real time price may be sitting around 20 dollars a megawatt hour. So you go off grid in Texas and you're paying som…”
Insight
Transmission lines act as direct substitutes for local baseload power generation
“The transmission line itself is a substitution for baseload power, because if you can move more power over more space, you are Reducing the need to have to generate that power on the other end of that congestion. So in that sense, transmission and generation a…”
Prediction Not checkable as stated
Virtual power plants will soon bridge grid capacity for large data centers
“So it does take some work to get it, and you're right, no one's done it at a, at any real scale yet but I think we're gonna see it pretty soon.”
Prediction Not checkable as stated
Land constraints will keep on-site renewables a niche data center solution
“That's still going to be a relatively small percentage of the overall market because we can't put everything in West Texas, right? We still are going to have The tendency to want to be closer to major metros where that sort of land availability is going to be …”
Prediction Not checkable as stated
Janous: Building simultaneous remote gigawatt data centers will cause severe labor delays.
“But if all, if too many people try to do that all at once, you're going to create a labor problem and you're going to have significant delays in getting a lot of this infrastructure stood up.”
Insight
Janous: Securing electric power creates a defensible competitive moat in AI.
“And so not to mention the fact that the ability to acquire and collect those electrons then in some ways creates a moat against other folks that would want to try to do the same thing. So the more electrons That you can get a hold of, especially in the AI worl…”