Dec 16, 2021 neutral
Assertion Supported
Kann: Data centers consume over 1% of global electricity
“We do consume over what data centers represent, like over one percent of global power consumption now, and growing, but not growing that much because energy efficiency of classical compute and of data centers Has been improving pretty rapidly.”
Shayle Kann Dec 16, 2021 ▶ 21:11 Quantum computing could be a critical climate solution
May 12, 2022 neutral
Prediction Not checkable as stated
Kann: Bitcoin will ultimately resemble data centers for electricity demand
“I think it's going to be like data centers probably ultimately, which means like significant source of electricity load that from a climate perspective is neither good nor bad basically.”
Shayle Kann May 12, 2022 ▶ 42:04 Shayle’s “ask me anything” episode
Jul 28, 2022 positive
Insight
Palmer: EV fleet charging hubs require the same skills as data centers
“I realized, you guys are building a data center. It was like the two by four moment where I realized, I've already done this, and this is exactly the type of skill that you need to build these large EV charging stations.”
Neha Palmer Jul 28, 2022 ▶ 17:52 Watt It Takes: TeraWatt Infrastructure CEO Neha Palmer
Aug 17, 2023 bullish
Insight
Kann: Time sensitivity makes data centers willing to pay microgrid premiums
“These data centers generally speaking are somewhat price insensitive, but time sensitive. And when you have that dynamic it creates a different kind of an opportunity to say like, well, okay, we got to deliver power sooner, even if it is a little more expensiv…”
Shayle Kann Aug 17, 2023 ▶ 41:21 Navigating the electricity gauntlet
Aug 17, 2023 bearish
Assertion Supported
Dominion Energy cannot power new Northern Virginia data centers until 2026.
“So for example, it's been reported that the electric utility in Virginia, Dominion, has basically told data center developers that they don't have capacity. They can't serve additional data center demand in Northern Virginia, which is one of the biggest areas …”
Andy Lubershane Aug 17, 2023 ▶ 12:48 Navigating the electricity gauntlet
Aug 17, 2023 neutral
Assertion Supported
Lubbershane: Compute grew 10x over a decade while power consumption rose 10%
“Computing, demand for computing has grown, as everyone knows, it's obvious, tremendously in the past 10 years. I think it's grown by about 10 X over that period. But over that same period, data center energy consumption Grew by just about 10%, which is actuall…”
Andy Lubershane Aug 17, 2023 ▶ 10:57 Navigating the electricity gauntlet
Aug 17, 2023 bearish
Prediction Not checkable as stated
Lubbershane: Surging electricity costs could cause voters to abandon decarbonization
“If the power sector isn't able to make it through this period and it results in People unable to build new manufacturing facilities, new data centers in a timely fashion. And if it results in kind of costs starting to spiral out of control, electricity costs s…”
Andy Lubershane Aug 17, 2023 ▶ 48:50 Navigating the electricity gauntlet
Oct 26, 2023 positive
Opinion
Hade: Data centers are probably the biggest driver of microgrids right now
“Data centers are probably the biggest driver of microgrids right now.”
Tim Hade Oct 26, 2023 ▶ 22:41 The market for microgrids
Oct 26, 2023 neutral
Assertion Supported
Hade: Most data centers globally use diesel generators for backup power
“Most data centers in the world today, those backup power generation devices are diesel generators, right? Increasingly, they're becoming natural gas generators, but for most data centers, they're diesel generators.”
Tim Hade Oct 26, 2023 ▶ 7:00 The market for microgrids
Nov 9, 2023 bullish
Opinion
Tech sector climate goals make data center load growth a net positive
“I generally think on balance, it's good because those customer sets tend to be particularly progressive when it comes to climate issues, and they're willing to put their money where their mouth is and take some risks that, that others will not.”
Shayle Kann Nov 9, 2023 ▶ 11:02 Mailbag episode! Interest rates, carbon dioxide removal, load growth, and more
Nov 9, 2023 neutral
Assertion Supported
Kann: Northern Virginia data center power queue exceeds current grid capacity
“Northern Virginia, where, like, there is a, the queue for new load coming from data centers alone, I think, is larger than the entire capacity of the system today in that region.”
Shayle Kann Nov 9, 2023 ▶ 8:45 Mailbag episode! Interest rates, carbon dioxide removal, load growth, and more
May 8, 2024 positive
Assertion Supported
Kann: Crypto mines are the most flexible data center assets in ERCOT
“The most flexible data center assets that we have seen, for better or for worse. A bunch of them are participating in demand response in ERCOT today.”
Shayle Kann May 8, 2024 ▶ 23:12 The news quiz episode!
Jun 13, 2024 neutral
Insight
Janus: Cloud Apps Cannot Seamlessly Move Regions During Data Center Outages
“I think people have this sense of the cloud as really being this sort of ethereal thing, and applications can just move around, and if one data center goes down, then, well, you can just move everything to another data center. That's not really how it works. W…”
Brian Janous Jun 13, 2024 ▶ 17:26 Under the hood of data center power demand
Jun 13, 2024 neutral
Opinion
Janus: Hyperscalers have deprioritized day-one clean power for immediate grid capacity
“You know, if you go back a few years, you know, zero carbon energy day one was really becoming a non-negotiable that, you know, we wanted energy, wanted to be zero carbon. We wanted to have it Done, ready to go when we plug in the data center. I think the, pro…”
Brian Janous Jun 13, 2024 ▶ 40:35 Under the hood of data center power demand
Jun 13, 2024 bearish
Prediction Open · timeframe Jun 2034
Janus: AEP will not connect 90 gigawatts in next decade
“There's no reason to believe that AEP is going to connect 90 gigawatts in the next 10 years.”
Brian Janous Jun 13, 2024 ▶ 13:35 Under the hood of data center power demand
Jun 13, 2024
Insight
Janus: AI training latency constraints require single-site gigawatt data centers
“Because those training models are in and of themselves a big machine, and so you can't, and this is not my forte and my area of expertise around the actual architecture inside of a training model, but my understanding of sort of the constraints there is that y…”
Brian Janous Jun 13, 2024 ▶ 11:19 Under the hood of data center power demand
Jun 13, 2024 bearish
Insight
Janus: Chip efficiency gains will not reduce AI data center power demand
“If let's say Meta, for instance, finds a piece of land or a point on the grid where they can pull three gigawatts, Of power on one location. And then the next day, NVIDIA comes out with a chip that's twice as efficient. Is Meta going to build a 1.5 gigawatt da…”
Brian Janous Jun 13, 2024 ▶ 41:36 Under the hood of data center power demand
Jun 13, 2024 bearish
Prediction Not checkable as stated
Janus: AI Training Loads Will Not Run as Intermittent Renewable-Following Workloads
“So I think it's a little bit overblown to say, and I think this is also true of Something like the conversation around crypto, but that these are highly curtailable loads that you could just, you know, attach a training model to a wind farm and only run it, yo…”
Brian Janous Jun 13, 2024 ▶ 22:39 Under the hood of data center power demand
Jun 13, 2024 neutral
Assertion Supported
Janus: Data Centers Account for Nearly 20% of Ireland's Electricity
“It's almost 20% of the entire country of Ireland's electricity are data centers, and they're almost all in Dublin.”
Brian Janous Jun 13, 2024 ▶ 31:00 Under the hood of data center power demand
Jun 13, 2024 neutral
Opinion
Janus: Standard 48-Hour Diesel Backup Is Probably a Data Center Relic
“I will say that backup is probably a bit of a relic because when we first started building these data centers, 15 years ago, most of them were relatively small. They were five or 10 megawatts. They were connected at distribution voltage. So the standard was pu…”
Brian Janous Jun 13, 2024 ▶ 19:09 Under the hood of data center power demand
Jun 13, 2024 neutral
Assertion Supported
EPRI Report: Data Centers Could Consume 10% of US Electricity by 2030
“There are breathless reports coming out almost daily at this point claiming data centers could consume up to maybe 10% of U.S. Electricity by 2030. That was the high end of a recent EPRI report.”
Shayle Kann Jun 13, 2024 ▶ 2:35 Under the hood of data center power demand
Jun 13, 2024 neutral
Assertion Partly supported
Janus: Every New Dublin Data Center Must Install On-Site Gas Generation
“So now every new data center in Dublin is getting a natural gas generator behind the meter so it can be flexible and, you know, avoid that contribution to system peak.”
Brian Janous Jun 13, 2024 ▶ 31:19 Under the hood of data center power demand
Jun 13, 2024 negative
Opinion
Janus: Powering Gigawatt-Scale Data Centers with Solar and Storage Is Not Feasible
“You're not going to put solar in storage to supply a 500 to gigawatt, 500 megawatt to gigawatt scale data center. I mean, it's just not feasible.”
Brian Janous Jun 13, 2024 ▶ 28:15 Under the hood of data center power demand
Jun 13, 2024 bearish
Prediction Not checkable as stated
Janus: Nuclear Power Will Not Solve Data Center Bottlenecks This Decade
“The focus that these companies have right now is getting data centers online in the next, Two, three, four years, and nuclear is not going to solve that problem.”
Brian Janous Jun 13, 2024 ▶ 28:31 Under the hood of data center power demand
Jul 18, 2024 neutral
Insight
Belady: Speed of light latency forces AI into massive, centralized data centers
“I think, and again, this is probably beyond my scope, but I think it really has to do with the size of the models and the latency, right? It takes too much time for light to travel larger distances, as hard as that is to believe. And so they tend to concentrat…”
Christian Belady Jul 18, 2024 ▶ 27:40 Can chip efficiency slow AI's energy demand?
Jul 18, 2024 neutral
Opinion
Belady: AI Growth Is Constrained by Broad Physical Supply Chains, Not Just Power
“I think we're moving into a world where it's not It's not demand driven, it's supply driven. You know, and we talk about power, but I think it's more than just power. It's trades to build data centers, right?”
Christian Belady Jul 18, 2024 ▶ 22:43 Can chip efficiency slow AI's energy demand?
Jul 18, 2024 bullish
Prediction Not checkable as stated
Kann: Minimizing energy consumption will be the primary data center design incentive
“It feels to me like the incentive for the foreseeable future as it pertains to designing everything that goes into the data center is minimize energy consumption.”
Shayle Kann Jul 18, 2024 ▶ 32:47 Can chip efficiency slow AI's energy demand?
Jul 18, 2024 positive
Assertion Supported
Belady: Microsoft Implemented Data Center Designs Boosting Pollinator Habitats
“And to Microsoft's credit, we did implement this where the data centers are being looked at to try to see how can we change the design so that we increase pollinators and habitat for pollinators so the fields around it get, have healthier yield”
Christian Belady Jul 18, 2024 ▶ 42:12 Can chip efficiency slow AI's energy demand?
Jul 18, 2024
Assertion Supported
Belady: Modern data center backrooms consume only 10% to 20% of power
“And at one time that was like, Two to three times the power was consumed in the back room, and then with the advent of PUE, people really focused on making data centers much more efficient, so now only about 10 to 20% of the power in a data center is consumed …”
Christian Belady Jul 18, 2024 ▶ 6:08 Can chip efficiency slow AI's energy demand?
Nov 7, 2024 neutral
Assertion Contradicted
McGavis: Data centers are currently the largest consumer of cooling
“Today, the biggest consumer of cooling is data centers. So as we talk about AI and all the AI applications, all that doesn't exist without a significant amount of cooling to keep those servers warm and keep those data centers operating.”
Ian McGavis Nov 7, 2024 ▶ 6:45 Fixing the refrigerant problem
Dec 5, 2024 positive
Opinion
Janous: Utilities should require proof of capital for gigawatt grid requests.
“If you're saying you're going to build a gigawatt data center, Or you're holding on to a gigawatt of power in a queue position. At some point, you need to be able to point to billions of dollars of capital that you have access to build out that infrastructure.…”
Brian Janous Dec 5, 2024 ▶ 40:45 Explaining the 'Watt-Bit Spread'
Dec 5, 2024 neutral
Assertion Supported
Janous: Land represents just 1% of a data center's 15-year total cost.
“I mean, on a total cost basis, you know, over a fifteen-year period, and, you know, TCO is the way we think about it in the world, land is about one percent. Of the cost to operate a data center. You know, the full stack with servers and everything.”
Brian Janous Dec 5, 2024 ▶ 16:05 Explaining the 'Watt-Bit Spread'
Dec 5, 2024 positive
Insight
Janous: Continuous data center loads benefit grids by improving infrastructure cost recovery.
“Having more data centers on the grid is good because they use power 8007 60 hours a year. So there's more cost recovery for more infrastructure in more hours if you have more data centers.”
Brian Janous Dec 5, 2024 ▶ 36:20 Explaining the 'Watt-Bit Spread'
Dec 5, 2024 neutral
Assertion Supported
Janous: Full-stack data center CapEx, including GPUs, costs $25M per megawatt.
“The cost of a data center today in terms of the full stack CapEx deployment all the way through GPUs is about 25 twenty-five million a megawatt or twenty-five billion a gigawatt”
Brian Janous Dec 5, 2024 ▶ 39:29 Explaining the 'Watt-Bit Spread'
Dec 5, 2024
Insight
Janous: Power capacity in 2027 is worth significantly more than in 2032.
“The value of a megawatt in twenty-twenty-seven is worth more than a value of a megawatt in twenty-thirty-two, because there's an assumption that by twenty-thirty-two, power will probably be more abundant, that will have sort of run through this cycle.”
Brian Janous Dec 5, 2024 ▶ 26:18 Explaining the 'Watt-Bit Spread'
Jan 9, 2025 bullish
Assertion Supported
Lafarge: Doubling grid capacity is the baseline, not a high-end scenario
“Even if you haircut the forecast growth in data centers and manufacturing by 80 or 90%, you still double the grid. And something I think we need to say more as an industry is doubling the grid is not the high-end reference case here. It's not the sort of what …”
Pierre Lafarge Jan 9, 2025 ▶ 8:53 Making DERs work for load growth
Jan 9, 2025 negative
Assertion Supported
Lafarge: EVs fell to third-biggest grid driver in just 24 months
“24 months ago, electric vehicles were the biggest driver of electrification growth, and now it's a distant third, and that happened stunningly quickly.”
Pierre Lafarge Jan 9, 2025 ▶ 6:16 Making DERs work for load growth
Feb 4, 2025 positive
Assertion Not checkable as stated
Engstrom: Rising AI Power Needs Are Driving Public Interest in Utilities
“And certainly, so we're seeing that more and more, I think, as awareness of data centers and AIs growing, and there, people are starting to hear that that requires a lot of electricity. They become more interested in utilities.”
Scott Engstrom Feb 4, 2025 ▶ 0:25 Are utilities ready to fully harness demand flexibility? [partner content]
Feb 6, 2025
Assertion Not checkable as stated
Kann: Readily available gigawatt-scale grid capacity no longer exists
“At that scale, gigawatt scale, oh wait, we just found a gigawatt of capacity, does not exist anymore.”
Shayle Kann Feb 6, 2025 ▶ 27:24 More 2025 trends: DeepSeek, plug-in hybrids, and curtailment
Feb 6, 2025 neutral
Assertion Supported
Bullard: Data centers consumed nearly 26% of Virginia's power in 2023
“Virginia is, you know, 30, just under 34 terawatt hours of power consumed by data centers in 2020 three, and almost 26% of state power already going to that.”
Nat Bullard Feb 6, 2025 ▶ 41:07 More 2025 trends: DeepSeek, plug-in hybrids, and curtailment
Feb 6, 2025
Assertion Supported
Kann: US spent $31B on data center structures in 2024, surpassing hospitals
“We spent more on data centers in terms of CapEx last year than hospitals. I didn't actually realize how much we spent on hospitals, to be honest with you. We spent thirty-one billion on data centers, twenty-seven billion on hospitals.”
Shayle Kann Feb 6, 2025 ▶ 37:19 More 2025 trends: DeepSeek, plug-in hybrids, and curtailment
Feb 13, 2025 bullish
Prediction Not checkable as stated
Kimber: Data centers are entering an era where grid connection is optional
“Generally speaking, I think we're moving into an era where grid connection is optional and should be optional. And that, you know, we should be able to, you know, operate these things fully off grid if necessary.”
Sheldon Kimber Feb 13, 2025 ▶ 23:28 The case for colocating data centers and generation
Mar 6, 2025 bullish
Prediction Open · timeframe Dec 2030
Kann: US data center capacity will more than double by 2030
“I was on the side of, we will see total capacity of data centers as measured in megawatts, or gigawatts, I guess, really double by twenty-thirty, and I was on the side that we will see it more than double.”
Shayle Kann Mar 6, 2025 ▶ 51:56 A skeptic’s take on AI electricity load growth
Mar 6, 2025 neutral
Assertion Supported
Koomey: US data center power share rose to 4.4% in 2023
“The U the U S number from the report to Congress that just came out from LBL was something like on the order of two percent of the electricity in 20, 20, 20, 21 was data centers. And now in 20, 23, now, 2023, which is the last historical year we have, it's 4.4…”
John Koomey Mar 6, 2025 ▶ 49:11 A skeptic’s take on AI electricity load growth
Mar 6, 2025 neutral
Prediction Not checkable as stated
Koomey: US data center load will double once more then level out
“It would not surprise me if You know, we saw another doubling, but I would say, you know, probably that's about it. I think that's going to level out, and then people are going to be more efficient at what they're doing based on the history”
John Koomey Mar 6, 2025 ▶ 54:13 A skeptic’s take on AI electricity load growth
Mar 6, 2025 negative
Opinion
Koomey: Anyone forecasting 2035 data center power demand is making it up
“So I think anyone who claims to know what's going to happen in twenty-thirty-five, the data center of electricity use, I think is just making it up.”
John Koomey Mar 6, 2025 ▶ 46:03 A skeptic’s take on AI electricity load growth
Mar 6, 2025
Assertion Supported
Koomey: Data center compute grew 6x while power rose only 6% (2010-2018)
“We had about a six-fold increase in the compute output for data centers from 20 10 to 20 18, but electricity use went up a grand total of six percent over that period.”
John Koomey Mar 6, 2025 ▶ 9:06 A skeptic’s take on AI electricity load growth
Mar 6, 2025 neutral
Assertion Supported
Koomey: IEA data center electricity estimates varied by 50% in 2024
“So for the year, 20, 22, the International Energy Agency did these projections. They did two of them in, in, in, 20, 24, and they started by trying to do history, and they looked at twenty-twenty-two, and the first study they released in January had a number t…”
John Koomey Mar 6, 2025 ▶ 12:24 A skeptic’s take on AI electricity load growth
Mar 11, 2025 positive
Opinion
AI clean energy efficiency gains outweigh data center power consumption
“Data centers use a lot of energy, but you'll have to use a lot of very dirty energy to compensate how much more efficient you can make the process of identifying Sites for clean energy.”
Laurent Bueneau Mar 11, 2025 ▶ 13:49 How AI is solving real utility challenges [partner content]
Mar 13, 2025 neutral
Opinion
Kann: Heavy industry seeking cheap power directly competes with data centers
“If you have low-cost, available, significant capacity electricity, you're fighting up against a data center, probably, or something else.”
Shayle Kann Mar 13, 2025 ▶ 21:08 An ode to electrochemistry
Mar 21, 2025
Assertion Supported
Johnson: US energy demand is rising for first time in two decades
“All of that is contributing to energy demand that is increasing for the first time in two decades. And that's a really material impact to the market, where we are going from a reality where demand was pretty stable since the financial crisis to a world where d…”
Alfred Johnson Mar 21, 2025 ▶ 25:12 Frontier Forum: How tax credit transfers are reshaping energy finance
Mar 27, 2025 positive
Opinion
Norris: Faster interconnection is the key value proposition for flexible data centers
“What would really present a value proposition for the hyperscalers and the large co-location data centers would be if you can actually interconnect them to the grid more quickly if they're able to offer this flexibility.”
Tyler Norris Mar 27, 2025 ▶ 14:37 The potential for flexible data centers
Mar 27, 2025 positive
Assertion Supported
Norris: Data center curtailment requires only partial load reduction in most hours
“When we ran the numbers, so like at that, that 0.25% load curtailment rate on average, we found that the number of hours in which Curtailment would be required. Some amount of curtailment would be 85 hours, but in 73 of those 85 hours, at least 50% of the new …”
Tyler Norris Mar 27, 2025 ▶ 19:32 The potential for flexible data centers
Mar 27, 2025 neutral
Assertion Supported
Kann: Data centers increasingly deploy natural gas bridge power for grid delays
“Lots of new data centers are, you mentioned this, right, bringing their own generation. And that could be renewables and batteries, but it's often natural gas generators. And they're doing that to increase time to power. I'm sorry, decrease time to power. Incr…”
Shayle Kann Mar 27, 2025 ▶ 22:18 The potential for flexible data centers
Mar 27, 2025
Assertion Supported
Norris: Data centers are not constant 24/7 flat electrical loads
“I don't know where this idea came from of 24 seven. They are not 24 seven loads, and it's critical to clarify this. So the servers may be 24 seven, right, the chips themselves, but there's an enormous amount of cooling infrastructure and other infrastructure a…”
Tyler Norris Mar 27, 2025 ▶ 28:29 The potential for flexible data centers
Mar 27, 2025 positive
Assertion Supported
Norris: 0.5% data center curtailment unlocks 98 gigawatts of capacity
“At 0.5% flexibility or curtailment of the new data center load, you could add up to 98 gigawatts of new data centers across the U.S. And at 0.25% curtailment of the new load, you could add 76 gigawatts.”
Tyler Norris Mar 27, 2025 ▶ 8:05 The potential for flexible data centers
Apr 7, 2025
Assertion Supported
Nasli: Data center thermal load equals electrical load
“The thermal load is just as large as the electrical load within data centers”
Adib Nasli Apr 7, 2025 ▶ 4:25 Frontier Forum: Future-proofing data center power infrastructure
Apr 7, 2025 bullish
Assertion Supported
Stadler: Microgrid power costs reach 3-4¢/kWh including capex over 20 years
“We really get down to three, four cents, including all the capital that we installed there, and we model actually escalation on the electricity side by 10% every year, and natural gas also going up by five percent every year. But still, at the end of the analy…”
Michael Stadler Apr 7, 2025 ▶ 11:15 Frontier Forum: Future-proofing data center power infrastructure
Apr 7, 2025 negative
Insight
Stadler: Standalone gas or diesel generators become stranded data center investments
“You might think that installing just a small gas generator, diesel generator might be the solution, but it's actually kind of stranded investment. Because, I mean, after, let's say the utility comes online and gives you the power of three or four years, you ha…”
Michael Stadler Apr 7, 2025 ▶ 5:22 Frontier Forum: Future-proofing data center power infrastructure
Apr 7, 2025 positive
Assertion Not checkable as stated
Stadler: Modeling shows data centers can operate 100% grid-independent
“And the analysis is that we did for these two cases actually suggested you can run 100% grid independent, right? And then it just becomes a redundancy challenge for the generators.”
Michael Stadler Apr 7, 2025 ▶ 13:23 Frontier Forum: Future-proofing data center power infrastructure
Apr 17, 2025
Insight
Friedmann: Hyperscalers prioritize deployment speed over cost and carbon
“We've learned the top five things that the hyperscalers and people building data centers want is, in this order, speed, speed, speed, cost, and carbon. All of those are important, but speed is the thing that is driving a lot of this.”
Julio Friedmann Apr 17, 2025 ▶ 3:45 Serving data center load with carbon capture
Apr 17, 2025 neutral
Assertion Supported
Khan: Data centers are driving planned natural gas build-out globally
“Anyway, we have talked before a little bit about the build-out of natural gas that is planned in the United States and a bunch of other countries that is being driven by data centers.”
Shayle Kann Apr 17, 2025 ▶ 2:28 Serving data center load with carbon capture
Apr 23, 2025 bearish
Prediction Open · timeframe Dec 2035
Waters: SMRs will not be a viable power source until the mid-2030s
“The challenge there is that between permitting and technology development that needs to happen, you're probably talking about, you know, mid 20 thirties before you see that become a real play.”
Jeff Waters Apr 23, 2025 ▶ 5:30 What’s next for the battery storage boom? [partner content]
May 1, 2025 bearish
Opinion
Chaset: Data center grid expansion is overhyped due to regulatory bottlenecks
“There's only so much connection capacity in the system and the ability to sort of expand connection capacity is reliant on utilities who are then in turn reliant on the regulatory commissions to give them authority to build new things. And the timescales at wh…”
Nick Chaset May 1, 2025 ▶ 17:36 Catalyst Live at SF Climate Week
May 1, 2025 bullish
Prediction Not checkable as stated
Schroepfer: Well-funded tech companies will build massive power capacity globally
“Underhyped in the sense that I like Respectfully disagree with Nick, which is just look at NVIDIA's earning calls. Like people are buying those chips and powering them up. So, and I think companies are, I spent a lot of time being incredibly creative about fin…”
Mike Schroepfer May 1, 2025 ▶ 19:05 Catalyst Live at SF Climate Week
May 20, 2025 bullish
Prediction Not checkable as stated
Data centers will drive widespread battery deployment across the grid
“Yes, I think we'll see a lot of batteries at data centers. I think we'll see a lot of batteries on the grid next to data centers. I think we'll see a lot of batteries That are on the grid far away from data centers. I think we're just going to see a lot of bat…”
Tristan Doherty May 20, 2025 ▶ 24:07 A former race car engineer on battery safety and supply chains [partner content]
Jun 5, 2025 positive
Assertion Supported
Kann: Data centers and utilities, not merchant generators, drive new gas build
“I don't think there is a lot of new merchant gas being developed. Mostly what's happening is it's other utilities saying we need it for, cause we need more capacity or it's data centers and there'll be the longterm offtake on the project.”
Shayle Kann Jun 5, 2025 ▶ 7:43 The gas turbine crunch
Jun 5, 2025 neutral
Assertion Partly supported
Brough: Roughly 1,400 new data centers are planned across the US
“There's like 1400 New data centers planned in the United States alone. And over a thousand of those are all large scale.”
Tony Brough Jun 5, 2025 ▶ 31:02 The gas turbine crunch
Jun 12, 2025 neutral
Assertion Supported
Sharp: Northern Virginia data centers have a 0.5% vacancy rate
“I mean, some of the most recent stats, it has .five percent vacancy rate, which is phenomenal.”
Chris Sharp Jun 12, 2025 ▶ 12:38 The state of play of data center development
Jun 12, 2025 neutral
Opinion
Sharp: Behind-the-meter data center power is merely a temporary stopgap
“Doing behind the meter, you know, becoming a power generation capability, I think is a short term gap. Nobody would be investigating that if we didn't have the constraint.”
Chris Sharp Jun 12, 2025 ▶ 30:03 The state of play of data center development
Jun 12, 2025 neutral
Assertion Not checkable as stated
Sharp: AI inference deployments require 5-megawatt blocks, unlike training arrays
“What we're really seeing is inference. Can come in, in like, five-ish megawatt blocks, and you can solve for it a bit differently. Now, the densification is still there, and then the private AI pieces, there's hot spots where it can be, you know, a couple of m…”
Chris Sharp Jun 12, 2025 ▶ 18:56 The state of play of data center development
Jul 3, 2025
Assertion Partly supported
Four data center projects could increase Duquesne Light's power demand by 40%
“From Duquesne Light, which has a relatively small service territory, and they said that there are four projects in advanced stages of connection, essentially, in their service territory. That could add 40% to their demand, and one really big hyperscale thing c…”
Nat Bullard Jul 3, 2025 ▶ 7:45 Fresh intel from state utility regulatory filings
Jul 3, 2025 bullish
Opinion
Data center power demand marks the biggest shift since initial U.S. electrification
“We're now in a place that we probably haven't seen since the U.S. Was being electrified full stop, where people are showing up and saying, hello, I have one thing that will materially change the shape of load and demand pretty much forever.”
Nat Bullard Jul 3, 2025 ▶ 8:10 Fresh intel from state utility regulatory filings
Jul 3, 2025 neutral
Insight
Current grid operators lack the institutional experience to manage rapid load growth
“I don't think that really anyone has got the muscle for this because it's not been in anybody's lived experience really. And so we're having to think about it pretty fresh.”
Nat Bullard Jul 3, 2025 ▶ 13:10 Fresh intel from state utility regulatory filings
Aug 28, 2025
Assertion Supported
Sivaram: Data centers cannot regularly run backup diesel generators under air permits
“If you have a lot of backup generation, you might fire up the backup generation. Often you're not allowed to because your diesel generator will violate its air permit if you use it regularly.”
Varun Sivaram Aug 28, 2025 ▶ 15:56 The mechanics of data center flexibility
Aug 28, 2025 neutral
Prediction Not checkable as stated
Sivaram: AI data centers could consume 25% of US electricity by 2035
“Data centers, which today are about four percent of American energy consumption, AI data centers are about five gigawatts of load, grow to 12% by the end of the decade. AI data centers could be anywhere up to 50 or even more gigawatts, to 25% of American load …”
Varun Sivaram Aug 28, 2025 ▶ 27:10 The mechanics of data center flexibility
Aug 28, 2025
Assertion Contradicted
Sivaram: Data center power demand has more than doubled annually
“The power demand from data centers has more than doubled. Every year, the last several years, and that trend shows no sign of abating.”
Varun Sivaram Aug 28, 2025 ▶ 11:24 The mechanics of data center flexibility
Aug 28, 2025 neutral
Assertion Supported
Kann: Data Centers Rarely Operate at Nameplate Peak Capacity
“First, because data centers aren't actually operating at nameplate peak most of the time anyway.”
Shayle Kann Aug 28, 2025 ▶ 2:59 The mechanics of data center flexibility
Aug 28, 2025
Insight
Sivaram: AI data center load profiles drastically change within a year
“A data center will not do a single thing for its lifetime, right? A massive data center, for example, may initially be configured and specified to train a large language model, and then you'll finish training the large language model, and then you'll do other …”
Varun Sivaram Aug 28, 2025 ▶ 14:19 The mechanics of data center flexibility
Aug 28, 2025
Opinion
Kann: Spatial load shifting fits hyperscalers, temporal flexibility fits anyone
“That feels to me like it is more readily available to the hyperscalers who have lots and lots of data centers probably within one region than it is to Others. The temporal one, in theory, available to anybody.”
Shayle Kann Aug 28, 2025 ▶ 19:59 The mechanics of data center flexibility
Sep 12, 2025 positive
Prediction Not checkable as stated
Virtual power plants will soon bridge grid capacity for large data centers
“So it does take some work to get it, and you're right, no one's done it at a, at any real scale yet but I think we're gonna see it pretty soon.”
Brian Janous Sep 12, 2025 ▶ 30:49 When to colocate data centers with generation
Sep 12, 2025 bearish
Prediction Not checkable as stated
Land constraints will keep on-site renewables a niche data center solution
“That's still going to be a relatively small percentage of the overall market because we can't put everything in West Texas, right? We still are going to have The tendency to want to be closer to major metros where that sort of land availability is going to be …”
Brian Janous Sep 12, 2025 ▶ 33:38 When to colocate data centers with generation
Sep 12, 2025
Insight
Utilities evaluate data center interconnections on peak capacity, not annual energy
“The problem we're trying to solve here is not that I need a 24 seven generation to match a 24 seven load. It's that I need to solve for The summer peaks and the winter system peaks in order to connect alone. That's what a utility does, and I think it's a, I th…”
Brian Janous Sep 12, 2025 ▶ 18:56 When to colocate data centers with generation
Sep 12, 2025 negative
Assertion Not checkable as stated
Off-grid Texas data centers pay up to 10x more for electricity
“If you look at it in a place like Texas, for instance, where the average price for electricity on any given day is actually pretty low. Like the real time price may be sitting around 20 dollars a megawatt hour. So you go off grid in Texas and you're paying som…”
Brian Janous Sep 12, 2025 ▶ 15:02 When to colocate data centers with generation
Sep 12, 2025 bearish
Prediction Not checkable as stated
Behind-the-meter nuclear data centers have no credible case for decades
“I don't think there's a credible argument for behind the meter nuclear at a data center in the near future. And by near future, I mean, The next couple of decades.”
Brian Janous Sep 12, 2025 ▶ 35:44 When to colocate data centers with generation
Oct 2, 2025 positive
Insight
Guernsey: Co-locating capacity at grid constraints helps solve data center bottlenecks
“This notion of, like, on-site versus off-site can be a little bit more flexible if you're willing to take into account the fact that as long as you're co-locating at the constraint, that's solving the problem, and now you have more tools in your toolkit, inclu…”
Dana Guernsey Oct 2, 2025 ▶ 32:59 The new wave of DERs
Oct 16, 2025 bearish
Prediction Open · timeframe Oct 2030
Kann: Co-located gas power will remain a minority of new data centers
“I think it's going to end up being the minority of new data centers, not the majority of new data centers.”
Shayle Kann Oct 16, 2025 ▶ 11:22 Calibrating hype with Akshat Rathi
Oct 21, 2025 bullish
Assertion Not checkable as stated
Sridhar: Data center developer interest in off-grid power jumped from 1% to 29%
“18 months ago, the survey, you know, like respondents said, one percent of the survey respondents said they will use on-site power that is not connected to the grid. Two months ago when we did the same survey, 29% of the respondents said they will use on-site …”
K.R. Sridhar Oct 21, 2025 ▶ 3:41 Frontier Forum: The new power map for AI infrastructure
Oct 21, 2025 bullish
Prediction Not checkable as stated
Sridhar: Off-grid data centers will not return to the grid
“I think once they get used to this and understand all the advantages of this digitally purpose-built on-site power, they are not going to switch back.”
K.R. Sridhar Oct 21, 2025 ▶ 4:29 Frontier Forum: The new power map for AI infrastructure
Oct 21, 2025 bullish
Prediction Not checkable as stated
Sridhar: High-power AI data centers must adopt captive on-site power
“We are finally building high electricity intensity AI factories. These are, these data centers are AI factories. They have been the exception and not the rule. They are now going to have to follow the rule.”
K.R. Sridhar Oct 21, 2025 ▶ 10:47 Frontier Forum: The new power map for AI infrastructure
Oct 30, 2025 neutral
Prediction Held up
Norris: Data centers will pair batteries with diesel backup generators going forward
“My sense is that all those two-hour battery storage deals that we just mentioned at data centers, they still have gensets, likely diesel for those longer duration emergency events, and they're not at all mutually exclusive, and in fact, it may be that predomin…”
Tyler Norris Oct 30, 2025 ▶ 25:45 Unpacking DOE's proposal to transform data center interconnection
Dec 4, 2025 bullish
Opinion
Matthew: Data center equipment and labor have pricing power unseen in generations
“Whereas now you're pricing power for the first time in, in generations, right? For certain equipment providers or certain labor producers.”
Shanu Matthew Dec 4, 2025 ▶ 18:12 Who benefits from the AI power bottleneck?
Dec 11, 2025 bullish
Assertion Not checkable as stated
Modon: Unlimited Industries can collapse data center design phases
“Instead of the design portion taking, call it six to nine months of your critical path. We can massively collapse that period of time. And that's really important for these data center projects to kind of accelerate how quickly we can actually build them.”
Alex Modon Dec 11, 2025 ▶ 28:29 Can AI revolutionize EPC?
Dec 18, 2025 bearish
Prediction Not checkable as stated
If AI scaling slows, repurposed central GPUs will cannibalize edge data centers
“And if it turns out that maybe there are diminishing returns from training larger and larger models, or maybe we run out of data because we've exhausted all the data that's available on the internet. When those things happen, it may be that demand for these GP…”
Dr. Ben Lee Dec 18, 2025 ▶ 32:52 Will inference move to the edge?
Jan 15, 2026 neutral
Assertion Supported
Bullard: Data centers represent only 8% of global electricity demand growth
“Space cooling, so just aircon and buildings is gonna be, like, 10% of the total growth. And data centers are right around eight percent.”
Nat Bullard Jan 15, 2026 ▶ 45:15 2026 trends: Gas turbines, Texas’ load queue and China electrifies
Jan 15, 2026 bullish
Prediction Not checkable as stated
Kann: Data centers will soon rise in global electricity demand growth rankings
“Data centers are gonna, I mean, even, even on a global basis, I think they're gonna move up this ranking before too long.”
Shayle Kann Jan 15, 2026 ▶ 46:16 2026 trends: Gas turbines, Texas’ load queue and China electrifies
Jan 20, 2026 bullish
Prediction Not checkable as stated
Burton: AI power demand will drive growth in grid optimization software
“That, you know, with this increasing demand, it's gonna create a ton of opportunity for businesses that solve the grid optimization problem that create software, and again, AI. So this data center and AI growth can actually contribute to improving delivery on …”
Tom Burton Jan 20, 2026 ▶ 17:38 A ‘rain delay’ for the energy transition [partner content]
Jan 20, 2026 bearish
Assertion Not checkable as stated
Burton: Data centers face power shortages rather than chip or land constraints
“There's plenty of space. There appear to be plenty of chips but there isn't enough power.”
Tom Burton Jan 20, 2026 ▶ 11:45 A ‘rain delay’ for the energy transition [partner content]
Jan 20, 2026 negative
Assertion Supported
Burton: Data centers drove ratepayer cost hikes and a moratorium in Ireland
“We've seen this in places like Ireland where there's a moratorium now on data centers. Energy prices have gone up so much. Rate payers have been forced to bear those extra costs.”
Tom Burton Jan 20, 2026 ▶ 12:27 A ‘rain delay’ for the energy transition [partner content]
Feb 19, 2026 bullish
Prediction Open · timeframe Feb 2031
Baglino: Data center rack voltages will reach 800V+ with SST architecture
“Now the backplane voltage of the racks will be 800 volts or even higher. And then you can use a SST based solution to go from medium voltage, 34 KV all the way to 800 volts with no gray space rooms with UPSs and power distribution panels and anything like that…”
Drew Baglino Feb 19, 2026 ▶ 42:23 The rise of grid power electronics with Drew Baglino
Feb 19, 2026 bullish
Assertion Not checkable as stated
Baglino: SSTs eliminate 70% of data center electrical components and footprint
“And you can remove 70% of the stuff in the in the electrical diagram and a similar amount of footprint”
Drew Baglino Feb 19, 2026 ▶ 43:08 The rise of grid power electronics with Drew Baglino
Feb 25, 2026 positive
Opinion
Roberts argues distributed capacity is faster and cheaper than on-site generation
“I would like to see them get serious about exploiting distributed capacity. I think that's faster and cheaper than on-site generation if we can get the financial and institutional arrangements lined up the right way.”
David Roberts Feb 25, 2026 ▶ 21:37 Volts crossover: Six big energy questions
Feb 25, 2026 negative
Prediction Open · timeframe Jan 2027
Kann predicts Hawley's bill mandating off-grid data centers will not pass
“Josh Hawley in the Senate and somebody else, I think introduced a bill that would essentially mandate data centers to go off grid. I, my presumption is that doesn't pass.”
Shayle Kann Feb 25, 2026 ▶ 15:17 Volts crossover: Six big energy questions
Mar 12, 2026 neutral
Assertion Supported
Elder: Interconnecting gigawatt-scale data centers takes 5 to 7 years in many markets
“How, how long can we, how much time will it take to build out the transmission capacity necessary to interconnect these mega sites, gigawatt scale sites to new power supply, ideally, you know, carbon free power supply. And in many markets, right, that's runnin…”
Jake Elder Mar 12, 2026 ▶ 5:55 AI scaling pathways: on grid, on edge, off grid, off planet
Mar 12, 2026 bullish
Prediction Not checkable as stated
Kann: Grid constraints make sub-uptime off-grid data centers inevitable
“In a world where we're so constrained, on the grid side, it seems inevitable to be that that is going to happen to some degree, and that the engineering challenge is going to get at least partially solved.”
Shayle Kann Mar 12, 2026 ▶ 22:09 AI scaling pathways: on grid, on edge, off grid, off planet
Mar 12, 2026 positive
Assertion Supported
Kann: Data center development is rapidly expanding into West Texas
“Historically, you know, there were these tier one markets, like Northern Virginia, or Chicago, or Phoenix, or whatever, Atlanta, and they were where 90% of the demand for new data centers was going to be, and there's still that. But it is broadening out quickl…”
Shayle Kann Mar 12, 2026 ▶ 26:32 AI scaling pathways: on grid, on edge, off grid, off planet
Mar 12, 2026 positive
Prediction Held up
Kann: On-grid, off-grid, edge, and space data centers will probably be built
“Massive data centers on the grid, massive data centers off-grid, small data centers on the edge, huge data center clusters in space. Each of these might get built. Actually, each of them probably will get built”
Shayle Kann Mar 12, 2026 ▶ 2:29 AI scaling pathways: on grid, on edge, off grid, off planet
Mar 12, 2026 neutral
Assertion Partly supported
Kann: Almost none of the 50 GW data center pipeline is off-grid
“There's like, 50 gigawatts of behind-the-meter generation and development at data centers, right? And they, and some people have interpreted that to be, oh, 50 gigawatts of off-grid data centers getting built. It's actually close to zero of those that are true…”
Shayle Kann Mar 12, 2026 ▶ 9:42 AI scaling pathways: on grid, on edge, off grid, off planet
Mar 19, 2026 bullish
Assertion Not checkable as stated
Moskowitz: US solar at 30 cents per watt remains cheapest to deploy
“The reality is, is, again, even at 30 cents a watt, and if we're made in the U.S., we are still the cheapest and fastest thing to deploy in pretty much every scenario.”
Scott Moskowitz Mar 19, 2026 ▶ 30:22 Scaling America's domestic solar supply chain
Mar 30, 2026 bullish
Assertion Supported
McAvoy: Data centers are funding off-site batteries to speed up grid interconnection
“We are seeing data centers like, you know, and even retail Energy providers who are coming to a utility hand in hand and saying, look, we want to put a data center here. I'm the retail energy provider. I'm going to provide this data center with energy. I neede…”
Sean McAvoy Mar 30, 2026 ▶ 21:27 Battery booms and the rise of flexibility [partner content]
Mar 30, 2026 positive
Opinion
McAvoy: Firm baseload power will always be data centers' top priority
“Like data centers need firm baseload power wherever they can get it. That is Is number one on their list. It'll always be number one because reliability is their number one concern for data centers.”
Sean McAvoy Mar 30, 2026 ▶ 15:26 Battery booms and the rise of flexibility [partner content]
Mar 30, 2026 neutral
Assertion Supported
McAvoy: Gas turbines have a three-year waiting list and build time
“It takes three years to build them out, and there's a waiting list for three years to even get them.”
Sean McAvoy Mar 30, 2026 ▶ 14:10 Battery booms and the rise of flexibility [partner content]
Mar 30, 2026 negative
Opinion
McAvoy: Sustainability is no longer top priority for US energy buyers
“Like, sustainability was number one on everyone's list. In the U.S., it is not anymore.”
Sean McAvoy Mar 30, 2026 ▶ 24:37 Battery booms and the rise of flexibility [partner content]
Mar 30, 2026 negative
Opinion
McAvoy: Solar and storage alone cannot fully power data centers
“They're not the answer. They are supplemental energy that can help, and they're kind of filling a gap until, you know, more jet generation comes online, and depends on what form of that jet generation can be.”
Sean McAvoy Mar 30, 2026 ▶ 21:05 Battery booms and the rise of flexibility [partner content]
Mar 30, 2026 neutral
Prediction Not checkable as stated
McAvoy: Scramble to power data centers will probably last three years
“So you were going through this kind of like chaotic phase at the moment, and it'll last for like probably like three years where whatever you can put together to get yourself online, you are going to do it.”
Sean McAvoy Mar 30, 2026 ▶ 26:26 Battery booms and the rise of flexibility [partner content]
Apr 9, 2026 neutral
Assertion Not checkable as stated
Power rates historically rose slower in regions with faster data center growth
“And, you know, some data shows that in areas where data centers grew more quickly, rates actually increased more slowly.”
Varun Sivaram Apr 9, 2026 ▶ 7:42 The rise of flexible data centers
Apr 9, 2026 bullish
Prediction Not checkable as stated
Data centers will accept power curtailment tiers for faster grid interconnection
“I believe that if electric power utilities and grid operators offered these, a range of different service tiers, just like on the compute side, the cloud operators offer a range of different service tiers to their end AI customers, innovation would solve this …”
Varun Sivaram Apr 9, 2026 ▶ 16:44 The rise of flexible data centers
Apr 9, 2026 bullish
Prediction Not checkable as stated
Data centers will install large-scale behind-the-meter battery storage systems
“We're going to put a lot of batteries behind the meter at data centers. Like, I'm pretty convinced that that's going to happen.”
Shayle Kann Apr 9, 2026 ▶ 40:28 The rise of flexible data centers
Apr 9, 2026 neutral
Assertion Supported
Data centers drive 94% of PJM load growth, 17% of US power
“The latest numbers show that in January of this year, NERC forecasts a summer peak increase of 224 gigawatts, almost all of which will come from data centers. Data centers now account for 94% of PJM's projected peak load growth, and by 20:30 EPRI forecast that…”
Varun Sivaram Apr 9, 2026 ▶ 5:47 The rise of flexible data centers
Apr 23, 2026 neutral
Disclosure
Vahdat: Many Google data centers target four nines of availability
“Many of our data centers aim for four nines of, I mean, minutes of downtime a year maximum, which as you said has a large amount of costs associated with it.”
Amin Vahdat Apr 23, 2026 ▶ 12:50 Inside Google’s massive AI capex (live)
Apr 23, 2026 positive
Insight
Vahdat: The AI industry should accept lower-reliability power delivery
“No, it is not intrinsic and we should be thinking about lower reliability power delivery overall.”
Amin Vahdat Apr 23, 2026 ▶ 12:16 Inside Google’s massive AI capex (live)
Apr 23, 2026 neutral
Insight
Vahdat: AI inference does not require gigawatt-scale data center capacity
“You don't strictly need a gigawatt of capacity to be able to do useful work. You probably don't even need a hundred megawatts of capacity. It gets a little bit more interesting than that because of, let's say, co-located compute and storage and networking and …”
Amin Vahdat Apr 23, 2026 ▶ 6:25 Inside Google’s massive AI capex (live)
Jun 18, 2026 neutral
Assertion Not checkable as stated
Kann: Off-grid data centers are usually temporary bridge power
“Because usually what's happening is that if the data center is operating off grid, it's temporary. It's a bridge power situation. Eventually they're going to get connected to the grid.”
Shayle Kann Jun 18, 2026 ▶ 21:41 Enter the electric supercycle
Jun 18, 2026 bullish
Prediction Not checkable as stated
Lubershane: Multi-year data center growth will force large-scale off-grid power adoption
“And if this data center boom continues for longer than the next three to five years, if it's really a robust trend that is gonna, you know, be, Decade plus, you know, for the foreseeable future, then I don't see any other option besides going to something like…”
Andy Lubershane Jun 18, 2026 ▶ 35:41 Enter the electric supercycle
Jun 18, 2026 bullish
Prediction Not checkable as stated
Lubershane: Data center electricity demand boom will last 3 to 5 years
“That is, of course, driven by the just extraordinary boom in demand from data centers that is happening right now, and I'm pretty confident is going to continue to be happening for the next three to five years, and honestly, who knows after that”
Andy Lubershane Jun 18, 2026 ▶ 9:00 Enter the electric supercycle
Jun 18, 2026 neutral
Assertion Supported
Lubershane: 2025 EV power demand growth matched data center growth globally
“The IEA recently came out with some data recently on global electricity demand growth, and it turns out that last year in 2025 from about, from a global standpoint, there was almost exactly as much electricity demand growth around the world from electric vehic…”
Andy Lubershane Jun 18, 2026 ▶ 13:20 Enter the electric supercycle
Jul 9, 2026 bearish
Opinion
Eliahu-Ontiveros: Deploying Bloom fuel cells means being islanded for life
“And if you do bloom, you're basically islanded for life. Either that, or maybe you get good at some point, and then you move your fuel cells to some other location but you can't use them as backup. It's not a very efficient solution for backup purposes.”
Jeremy Eliahu-Ontiveros Jul 9, 2026 ▶ 34:29 Inside the AI power wars
Aug 6, 2026 bullish
Assertion Not checkable as stated
Hawkins: Gigawatt-scale campuses are now standard in data center planning
“It is completely normal to talk about gigawatt campuses today.”
Raymond Hawkins Aug 6, 2026 ▶ 24:44 The electrician shortage slowing the AI boom
Aug 6, 2026 positive
Insight
Off-site data center manufacturing shifts travel jobs to local shifts, improving diversity
“And so by doing offsite manufacturing, putting together large components of our data centers offsite, it allows for a safer, more diverse, and more reliable product, right? Safer for the employees, more diverse, because giving somebody, hey, you can be here fr…”
Raymond Hawkins Aug 6, 2026 ▶ 18:45 The electrician shortage slowing the AI boom
Aug 6, 2026
Insight
Hawkins: Data center rent is billed per kilowatt because power limits facilities
“The reason we charge rent based on, on kilowatts is it is the limiting factor in the building.”
Raymond Hawkins Aug 6, 2026 ▶ 8:55 The electrician shortage slowing the AI boom
Aug 20, 2026 bullish
Opinion
Wong: The grid has enough latent capacity for most data centers today
“So let me just make a statement here, which is, I believe the grid has enough existing latent capacity to connect the majority, if not all of the data centers today.”
Josh Wong Aug 20, 2026 ▶ 37:27 Can AI revolutionize grid operations?
Sep 3, 2026 positive
Assertion Partly supported
Janous: Data centers spurred massive civic investment and job gains in Quincy
“There was a fantastic story just in the last week about Quincy Washington building a fifteen million dollar aquatic center and they have a hundred and fifty million dollar state of the art school and their unemployment rate has gone from like 29% to six percen…”
Brian Janous Sep 3, 2026 ▶ 5:45 What comes after the data center backlash?
Sep 3, 2026 neutral
Assertion Not checkable as stated
Janous: GE Vernova builds 2.6 GW capacity for one-gigawatt data center
“In fact, I was talking to Someone from GE Vernova yesterday, and he was talking about for this gigawatt data center, they're having to build 2.6 gigawatts of capacity across generation and batteries and everything else.”
Brian Janous Sep 3, 2026 ▶ 25:47 What comes after the data center backlash?
Sep 3, 2026 negative
Opinion
Janous: On-site power plants make data center community backlash worse
“Do they really want a data center plus a power plant next door? That also seems like not the right solution. Like, I think that's, Worse than a data center connected to the grid.”
Brian Janous Sep 3, 2026 ▶ 26:18 What comes after the data center backlash?
Sep 3, 2026 bearish
Prediction Not checkable as stated
Janous: US data center constraints will persist through 2030 and beyond
“All the stuff we thought we were going to build in this country, or thought we could build, a lot of that's not going to get built, because of all the things we've just been talking about. Like, I think that, and this problem is going to persist for the forese…”
Brian Janous Sep 3, 2026 ▶ 40:30 What comes after the data center backlash?
Sep 3, 2026 negative
Insight
Janous: Taking data centers off-grid prevents broader electricity rates from decreasing
“It's fine micro, but I would even say, I mean, if you believe that a larger denominator is actually good for lowering electricity rates over time, it's actually negative in that you're taking that denominator off the grid.”
Brian Janous Sep 3, 2026 ▶ 29:34 What comes after the data center backlash?
Sep 3, 2026 bearish
Prediction Not checkable as stated
Kann: Political backlash against data centers will worsen over the next two years
“I would bet on this being the case for the next couple of years that it gets worse before it gets better. Partially because of the political timing that you described, it's just there currently where we stand today, there is no political advantage to being the…”
Shayle Kann Sep 3, 2026 ▶ 31:07 What comes after the data center backlash?
Sep 3, 2026 positive
Opinion
Kann: Google has the best community playbook among data center developers
“Google maybe is the best at this, have a playbook where you address all of those things as close to upfront as you can, and you offer a lot in exchange to the community.”
Shayle Kann Sep 3, 2026 ▶ 12:02 What comes after the data center backlash?
Sep 3, 2026 positive
Assertion Not checkable as stated
Janous: Data centers use little water compared to agriculture and golf courses
“And if you look at the actual facts, like, data centers do not use that much water relative to, you know, fill in the blank, almonds, avocados, golf courses, you know, so.”
Brian Janous Sep 3, 2026 ▶ 6:59 What comes after the data center backlash?
Sep 3, 2026 positive
Opinion
Kann: Data centers entering a community tend to lower local electricity rates
“The objective truth, particularly today, is that a data center coming into a community tends to lower rates because nowadays, you You know, the deal that the utility is striking with the data center is basically guaranteed to do that, sort of the whole point.”
Shayle Kann Sep 3, 2026 ▶ 19:15 What comes after the data center backlash?
Sep 10, 2026 positive
Assertion Supported
Kann: Utilities are asking regulators for rate cuts due to data centers
“We're now seeing the first, like, announcements from utilities of going to regulators and requesting rate decreases as a result of large loads in their territory. We've seen a few of those now.”
Shayle Kann Sep 10, 2026 ▶ 9:42 Do data centers actually increase electricity prices? No...and yes
Sep 10, 2026
Assertion Supported
Lubershain: Energy accounts for 5% to 10% of data center operational costs
“Energy is a pretty small share of the total cost of goods sold for that That data center, right? It's something like five to 10% of the total cost.”
Andy Lubershane Sep 10, 2026 ▶ 31:15 Do data centers actually increase electricity prices? No...and yes
Sep 10, 2026 bearish
Insight
Lubershain: Data center demand shock creates systemic price inflation across electricity delivery
“There's a demand shock and supply chains, like basically every step in the supply chain for equipment, For the electricity system to deploying that equipment and getting it online and hooking everything up is bottlenecked and cannot keep up with demand. And be…”
Andy Lubershane Sep 10, 2026 ▶ 19:02 Do data centers actually increase electricity prices? No...and yes
Sep 10, 2026 negative
Insight
Lubershain: Data center growth inflates utilities' non-negotiable grid maintenance costs
“Two-thirds of the expenditures they're making today across utilities are non-negotiable, and it's, Has nothing to do with growth, right? All that stuff would be happening even if the data center, boom, were not happening. And so, all that stuff is getting more…”
Andy Lubershane Sep 10, 2026 ▶ 20:31 Do data centers actually increase electricity prices? No...and yes
Sep 10, 2026 neutral
Opinion
Kann: Data centers lower local electricity rates but increase macro power prices
“At the local level, data centers seem to on balance, probably decrease electricity prices currently. And at the macro level, they are definitely a factor contributing to an increase in electricity prices.”
Shayle Kann Sep 10, 2026 ▶ 28:01 Do data centers actually increase electricity prices? No...and yes
Sep 10, 2026 positive
Assertion Supported
Lubershain: EPRI found data centers already slightly lower average customer bills
“And when you do control for other variables that might bias the analysis Epri found that basically, on average, data centers are lowering customer bills a little bit already. So we are seeing, it's not a major impact, it's something like six percent, but data …”
Andy Lubershane Sep 10, 2026 ▶ 14:48 Do data centers actually increase electricity prices? No...and yes
Sep 10, 2026 neutral
Opinion
Lubershain: Data centers are the biggest factor driving global electricity demand growth
“So at a global level, data centers are one factor among many, but I'd say they're the biggest factor that is causing this global Growth in demand for electricity, which is happening so quickly now, especially because of data centers and the urgency with which …”
Andy Lubershane Sep 10, 2026 ▶ 18:28 Do data centers actually increase electricity prices? No...and yes
Sep 10, 2026 bearish
Prediction Not checkable as stated
Lubershain: Electricity rates will rise for most people in coming years
“Data centers are absolutely going to be pushing up rates, and other factors, right, in the supply chain. Rates are going up for most people in most places, I think, in the years to come.”
Andy Lubershane Sep 10, 2026 ▶ 16:57 Do data centers actually increase electricity prices? No...and yes
Sep 10, 2026 neutral
Assertion Not yet assessed · timeframe Sep 2027
Lubershain: Large data centers add 10% to 30%+ to mid-sized utility loads
“For a mid-sized utility, most of the kind of, Hundreds of megawatt scale data centers we're seeing today would add 10%, 20%, 30%, or more if we're getting up to gigascale data centers to the utility's total load.”
Andy Lubershane Sep 10, 2026 ▶ 8:31 Do data centers actually increase electricity prices? No...and yes
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 200 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.