Dr. Michael Stadler leads the development of Xendee's microgrid and distributed energy resource design, planning, and optimization software platform. He previously served as a staff scientist leading the Grid Integration Group at Lawrence Berkeley National Laboratory.

6statements → 4claims → 2claims resolved → 4/5average certainty → 2.5/5average debate potential →

2 supported 0 partly supported 0 contradicted 2 not checkable as stated how the 4 claims stand · each chip opens the sources

4 assertions · 2 insights · every statement was checked. The predictions and assertions are the 4 claims: statements the public record can support or contradict. 2 are resolved, and 2 name no date, number or outcome precise enough to check. Everything else (opinions, insights, what ifs, disclosures) can never be settled by the record, so it carries no assessment.

The record, in short

What the tape says about how Michael argues and how the claims held up. Everything they said, and everything said about them, is in the tabs below.

Their most notable supported claim

Assertion Supported
Stadler: Microgrid power costs reach 3-4¢/kWh including capex over 20 years
“We really get down to three, four cents, including all the capital that we installed there, and we model actually escalation on the electricity side by 10% every year, and natural gas also going up by five percent every year. But still, at the end of the analy…”
Michael Stadler Apr 7, 2025 ▶ 11:15 Frontier Forum: Future-proofing data center power infrastructure

Everything Michael Stadler said on Catalyst that made the record, most notable first. Filter by type, assessment or year in the ledger →

Assertion Supported
Stadler: Microgrid power costs reach 3-4¢/kWh including capex over 20 years
“We really get down to three, four cents, including all the capital that we installed there, and we model actually escalation on the electricity side by 10% every year, and natural gas also going up by five percent every year. But still, at the end of the analy…”
Michael Stadler Apr 7, 2025 ▶ 11:15 Frontier Forum: Future-proofing data center power infrastructure
Insight
Stadler: Standalone gas or diesel generators become stranded data center investments
“You might think that installing just a small gas generator, diesel generator might be the solution, but it's actually kind of stranded investment. Because, I mean, after, let's say the utility comes online and gives you the power of three or four years, you ha…”
Michael Stadler Apr 7, 2025 ▶ 5:22 Frontier Forum: Future-proofing data center power infrastructure
Assertion Not checkable as stated
Stadler: Modeling shows data centers can operate 100% grid-independent
“And the analysis is that we did for these two cases actually suggested you can run 100% grid independent, right? And then it just becomes a redundancy challenge for the generators.”
Michael Stadler Apr 7, 2025 ▶ 13:23 Frontier Forum: Future-proofing data center power infrastructure
Insight
Stadler: Pure solar and battery microgrids are uneconomic for outage resilience
“If you, if you're focusing on costs and carbon emissions, you will always see a combination between renewable technologies and In some gas fart engines for backup reasons or for resiliency reasons, right? It's pretty bad idea from an economic perspective to ha…”
Michael Stadler Apr 7, 2025 ▶ 19:08 Frontier Forum: Future-proofing data center power infrastructure
Assertion Supported
Stadler: Microgrids cut data center power costs up to 80% in modeling
“And we have seen cost reductions up to 80% in, in California and 60% in Virginia While the electricity rate was really almost half than in California.”
Michael Stadler Apr 7, 2025 ▶ 7:23 Frontier Forum: Future-proofing data center power infrastructure
Assertion Not checkable as stated
Stadler: Early microgrid feasibility studies cost $500k and took five engineers a year
“As I did this the first time, I mean, more than 10 years ago, it was half a million dollar five engineers working a full year to figure out how big a battery, a PV system should be for demand, charge management, all that stuff, right?”
Michael Stadler Apr 7, 2025 ▶ 21:43 Frontier Forum: Future-proofing data center power infrastructure

Appearances (1)

EpisodeDateSpeaking time
Frontier Forum: Future-proofing data center power infrastructure Apr 7, 2025 11m
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 200 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.