Prediction Held up AI assessment confidence: 90% certainty 3/5 debate potential 2/5

Norris: Data centers will pair batteries with diesel backup generators going forward

Tyler Norris · Unpacking DOE's proposal to transform data center interconnection · Oct 30, 2025 · at 25:45

Tyler Norris discusses whether short-duration batteries replace backup diesel generators at data centers or serve a complementary role.

0:00 / 0:18exact quote · 19.0s
720p mp4 · rendered on demand · StarZero watermark
“My sense is that all those two-hour battery storage deals that we just mentioned at data centers, they still have gensets, likely diesel for those longer duration emergency events, and they're not at all mutually exclusive, and in fact, it may be that predominantly we see that kind of arrangement going forward where we do have battery storage.”

quote is from the automated transcript, cleaned for reading: filler sounds and stutters are removed, nothing is rephrased. names can be misheard (the analysis reads context, assessments check outside sources). how →

More from Tyler Norris

Assertion Supported
Norris: 0.5% data center curtailment unlocks 98 gigawatts of capacity
“At 0.5% flexibility or curtailment of the new data center load, you could add up to 98 gigawatts of new data centers across the U.S. And at 0.25% curtailment of the new load, you could add 76 gigawatts.”
Tyler Norris Mar 27, 2025 ▶ 8:05 The potential for flexible data centers
Opinion
Norris: Proactive transmission planning matters even more than interconnection queue reform
“The biggest Additional piece is improving the proactive transmission planning process and not relying as much on the interconnection process.”
Tyler Norris Sep 21, 2023 ▶ 41:12 Fixing interconnection
Prediction Open · timeframe Mar 2032
Norris: AI data centers could drive 44% of US electricity load growth
“Yeah, I think what really opened our eyes were some of these forecasts suggesting that AI specialized data centers are going to be likely the single largest driver of U.S. Electricity load growth for the next five to seven years, with some numbers suggesting a…”
Tyler Norris Mar 27, 2025 ▶ 4:43 The potential for flexible data centers
Assertion Supported
Norris: Roughly half of all US generation and transmission is unused
“And so what that basically means is that in any given hour, On average, approximately half of all generation and transmission infrastructure is unused on average in the U.S., and it's actually worse than that because you're not counting for all the reserve ma…”
Tyler Norris Mar 27, 2025 ▶ 10:40 The potential for flexible data centers
Opinion
Norris: Faster interconnection is the key value proposition for flexible data centers
“What would really present a value proposition for the hyperscalers and the large co-location data centers would be if you can actually interconnect them to the grid more quickly if they're able to offer this flexibility.”
Tyler Norris Mar 27, 2025 ▶ 14:37 The potential for flexible data centers
Assertion Supported
Norris: Data center curtailment requires only partial load reduction in most hours
“When we ran the numbers, so like at that, that 0.25% load curtailment rate on average, we found that the number of hours in which Curtailment would be required. Some amount of curtailment would be 85 hours, but in 73 of those 85 hours, at least 50% of the new …”
Tyler Norris Mar 27, 2025 ▶ 19:32 The potential for flexible data centers
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 200 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.