Kann: 10 GW of batteries capped ERCOT prices below $250/MWh
“We hit a new net load record in ERCOT because it was a hot day, and we had 10 gigawatts of batteries dispatch, and so prices never got above 250 bucks a megawatt hour”
Hade: Grid interconnection queue wait times reach up to nine years
“If you want to build a utility scale battery in PJM today, and you submit your interconnection application to get in the queue, on average, you're waiting about six years right now. In Kaiso, you're waiting maybe nine years. In ERCOT, you're waiting maybe four…”
McAvoy: Texas battery storage pricing peaked in 2023 then fell sharply
“And I think the last really good year of battery pricing, for example, in Texas was probably around, like, twenty-twenty-three. And then it started to really drop in 24. And then, like, we saw it further in twenty-twenty-five.”
McAvoy: ERCOT battery storage prices will rebound within two years
“And so we see cyclically in another couple of years, the prices will start to come back in ERCOT and people will start to make money again.”
Siegel: Forward power prices topped $1,000/MWh ahead of recent storm
“Power prices for the subsequent week went well over a thousand dollars per megawatt hour for the subsequent week.”
Kann: 10 GW of Texas load curtailed purely from price signals
“10 gigawatts of load that was expected to show up didn't show up. There is no formal demand response program, but it's a price signal, and so this is like maybe the most stark example that I've seen of load responding to price at that kind of scale.”
Siegel: ERCOT forward market pricing cannot support new gas generation
“There was a big push through legislation to support new gas fire generation and ERCOT. I think if you look at forward markets, that's not supported by market pricing today. It may be supported by bilateral contracting opportunities, but when you look purely at…”
Siegel: Battery saturation in ERCOT has compressed incremental investment returns
“A couple of years ago, we transitioned Intercut from a market that relies heavily on ancillary services to support batteries, and that was very robust. We built into that. That market was overwhelmed with supply, and then when you move out of the sort of small…”
Siegel: Power market volatility will push large loads into long-term contracts
“Volatility itself, I think will encourage them to look at contracting to enter into longer term arrangements to mitigate their risk and to support ongoing construction development of the kind of resources that we're going to need to keep this market in equilib…”
Kann: ERCOT large load interconnection queue reached 226 GW by November 2025
“The pipeline of large load interconnection requests in ERCOT in Texas was, what, 40, forty-ish, 42 gigawatts as of January of twenty-twenty-four. So two years ago, it went from forty-ish, 42 gigawatts to 226 gigawatts as of November of 25”
Bullard: Texas will not build 226 GW of large load by 2033
“I don't think that Texas is actually going to be building 226 gigawatts of just large load in the coming, let's say, seven to eight years.”
Bullard: Texas 2030 demand forecasts diverge between 1,000 TWh and 1,600 TWh
“ERCOT says, you know what, we could go from, like, a little under 500
Terawatt hours in 2024 to like a thousand by 20 30, right?
So let's call it, you know, up a 110% in that time period.
The transmission service providers on the other hand are like, sorry …”
Bullard: Texas electricity demand will land closer to ERCOT's lower 2030 forecast
“The true number is,
Either somewhere in between or much closer to ERCOT's figure.
I mean, ERCOT has the reason for demand, supply balancing, and upkeep, and everything else to get it really, really accurate in energy terms.
But the transmission service prov…”
Gramlich: Four US grid regions are planning 765 kV lines
“You've got seven 65 KV AC plans. We mentioned SPP, but MISO in the more of the, like, the Great Lakes part of the Midwest and is looking at seven 65 PJM as well, and they just came out with a new very much more ambitious plan than we've seen from them. In the …”
Garabedian: ERCOT green power prices doubled to $65/MWh amid AI demand
“If you look in West Texas and you were to sign a solar and wind kind of affirmed green power purchase agreement in, in Texas and Urquhart territory three years ago, you might've paid 35 dollars a megawatt hour for that product. Today you're paying 65, maybe mo…”
Dell: Base Power deployed to 5,000 homes with only one churned customer
“We've got on the order of 5000 of these batteries in the ground actually 5000 homes, and so it's more batteries, because a lot of them have two. We have had, in our direct business, we have had one customer”
Dell: ERCOT power market volatility will eventually rebound due to load growth
“When volatility is high, people want to build a lot of batteries, and a lot of batteries presumably dampen volatility, and when volatility is low, people don't want to build a lot of batteries... Load growth is likely to still march up. Solar additions are lik…”
Dell: Base Power will soon have the largest shared battery aggregation in the US
“And, you know, very soon here we'll have the largest aggregation
by a wide margin.
and you know, we'll, we'll continue to grow quickly and we'll be the largest aggregation of shared batteries in the country.”
Patel: ERCOT and PJM are instituting rules to cut data center power
“So this has happened in Texas, ERCOT, and it's happening in PJM which is the main, you know, the sort of northeast kind of area-ish. These two grids are putting these, like, rules where, hey, we're gonna actually say, hey, big loads, we can tell you, 24 hours …”
Waters: Storage market trading softened amid ERCOT and CAISO saturation
“The market trading piece has softened a little bit, just because those markets have been reasonably saturated, both in ERCOT and, in CAISO.”
Norris: ERCOT, PG&E, and SCE offer programs trading flexibility for interconnection
“ERCOT has this controllable load service, which does make that sort of trade-off explicit. PG&E is doing it with their new FlexConnect program, primarily at distribution scale for EV chargers, but the hope is to expand it. Southern California Edison has a simi…”
Norris: ERCOT gets generation online faster by waiving upfront deliverability
“And, right, that's exactly what ERCOT does, right, for generation. They don't require upfront deliverability, and it allows them to get generation online much more quickly and at much higher rates.”
Engstrom: Direct wholesale-indexed retail power plans have largely died in Texas
“And so that, I think, as a pricing plan has largely died in Texas.”
Johnson: Texas grid batteries earned 4x more revenue than UK in 2023
“A battery in Texas last year, and by battery I mean a grid scale sort of front of the meter asset, made over four times more than a battery in the GB market or the UK market, which is a huge difference.”
Kann: Crypto mines are the most flexible data center assets in ERCOT
“The most flexible data center assets that we have seen, for better or for worse. A bunch of them are participating in demand response in ERCOT today.”
Kann: Crypto Mines Are the Most Flexible Data Center Assets
“Those like, crypto mines have been the most flexible data center assets that we have seen, for better or for worse. A bunch of them are participating in demand response and ERCOT today.”
Jaramillo: ERCOT price spreads justify 1-to-4-hour batteries, not 100-hour arbitrage
“Right now, there aren't enough hours that have a long enough spread where it makes sense to have a hundred hour bar doing that. It does make sense for a four hour or two hour battery or even a one hour battery, frankly in ERCOT.”
Norris: Cluster studies lack proof of speeding up grid interconnection queues
“What I think is fair to say is that we don't really have good empirical evidence, ah, to prove or disprove this hypothesis yet. There have been, ah, transmission providers that have shifted to cluster studies in recent years. I was very involved in one of thos…”
Norris: Texas reached 17 GW of utility-scale solar, rivaling California
“ERCOT is now at about 17 gigawatts of utility scale solar installed. The state at large at around 20 gigawatts of all solar. So it's now number two in the U.S. Just behind California. And the utility scale side now appears effectively equivalent with Californi…”
Norris: ERCOT connects energy projects 2.5 times faster than PJM
“The overall peak load in PJM is approximately two times that in ERCOT, and yet PJM's interconnection rate overall for all resources over the past two years has been approximately 2.5 times less than ERCOT.”
Norris: ERCOT decouples grid upgrades from interconnection to speed up projects
“The defining feature of ERCOT's interconnection process is that they don't rely on the interconnection process itself to identify and pay for grid upgrades. And this enables them to interconnect projects much more quickly and at much lower cost.”
Norris: ERCOT's planning process pursues fewer proactive grid upgrades than needed
“It's worth noting that there are some really significant limitations to ERCOT's transmission planning process, and there are a lot of concerns that it doesn't Incorporate the longer-term benefits of these upgrades, and the result is that they aren't, they prob…”
Norris: High ERCOT interconnection rates are driven by generators accepting curtailment risk
“What we're seeing is that a very, very large number of generators Believe that they are able to manage this risk, and that's contributing to this high interconnection rate.”
Norris: Non-ERCOT US power markets are unlikely to adopt energy-only models
“So we're unlikely to see other markets go in an energy-only direction, and the question is whether we can incorporate some of
The learnings and the process improvements that ERCOT has achieved into this alternative framework where you have both energy and capa…”
Storrow: Renewables are serving 30% of Texas's 82 GW peak load
“We're getting, on some of the records, we're seeing there are days where, you know, renewables are serving 30% of the Texas, of Texas load, of ERCOT load, and I mean, 30% of ERCOT's load, it's 82 gigawatts.”
Storrow: Solar generation mitigated Texas grid crises during summer heatwave
“They have issued some voluntary conservation notices, but it has not been quite as White knuckle driving as it has been in the last couple years, and a big part of that is, is the amount of renewable generation, and particularly solar, that they're having.”
Tomlinson: 80 GW of battery storage is in ERCOT's interconnection queue
“You know, we've got 80 gigawatts of battery storage in the queue to interconnect into the ERCOT grid at, right now.”
Hertz-Shargel: Bitcoin mining raises Texas power bills by $1.8B annually
“So collectively, it's 1.8 billion conservatively per year. And that's sort of a run rate, I would say. And that represents around a five percent increase in costs of Texans, of, you know non-Bitcoin mining consumers. And that, that's across all the different s…”
ERCOT Responsive Reserve Service paid $180 per kilowatt-year in 2022
“If you were to participate in the responsive reserve service, RRS, last year you would have earned a 180 dollars per kilowatt year, which is a really high number.”
Reed: External Transmission Can Support Under 1% of ERCOT Load
“And then ERCOT is incredibly isolated. So there's one or two ERCOT has some minimal Back to back and some minimal AC at sort of very low voltage, but incredibly isolated. I think less than one percent of their load or something is available via transmission. C…”
Reed: Non-ERCOT Texas avoided prolonged blackouts through grid interconnections
“And even the parts of Texas that were not run by ERCOT, especially, right, were experiencing this extreme weather, but did not have this massive multi-day blackout problem. Because they had so much more power available and were able to share it.”
Shah: Banks are actively debt-funding Texas battery storage on merchant curves
“They take merchant risk now. You see all of the battery storage deals that are getting debt funded in Texas on ERCOT merchant curves.”