Nolan: Physical infrastructure and permitting lag behind labor responsiveness
“I think labor responds. It probably takes a few years, but it's faster than building infrastructure. And so infrastructure is probably the bottleneck and then Is it just energy? Probably not just energy, probably permitting can take a while.”
Burton: Permitting is probably more critical than tax credits for developers
“I do think that permitting probably is as important, if not more important than, you know, tax credits and some other incentives. You know, the incentives you can model without and with, right? So you can at least figure out what the answer is. When you don't …”
Guthrie: Permitting takes longer than construction for US datacenters
“Candidly here in the U S the longest Part of building a data center is getting permitting. It's not actually the construction.”
Ross: US nuclear power permitting costs triple actual construction costs
“He said they spend three times as much on the permitting in the United States than on the nuclear power plant.”
Suarez: Building permits could be processed instantly with current technology
“It should be done instantly, and it could literally be done instantly with a technology that we already have available to us today.”
Naam: Continent-scale transmission is the most underrated clean energy technology
“The most underrated of those technologies is super long duration transmission. That is probably the one that... Ultra long distance, like coast-to-coast, continent-scale transmission. It's probably the one that has the best upside and the most certainty that w…”