Southwest Power Pool, every mention

11 scenes · ← back to Southwest Power Pool

tap a year for its mentions
00521032023202420252026episodesmentions
0232023202420252026episodes it came up in
0021.5432023202420252026episodesmentions per episode

every year anyone Rob Gramlich 5Shayle Kann 3Tyler Norris 2Dana Guernsey 2Mateo Jaramillo 1

Verbatim, from the transcripts: the passages where Southwest Power Pool comes up

loading…

PJM and ERCOT navigate a capacity rollercoaster Feb 12, 2026 · 1 mention

  • ▶ 40:24 Shayle Kann I look forward to the next weird flare-up being in, like, MISO or SPP or New England ISO or CAISO or something like that.

Looking for a turnaround in transmission Nov 20, 2025 · 6 mentions

  • ▶ 8:34 Rob Gramlich So it applies to the, the grid operators like PJM and MISO and SPP and California ISO, but also to the, uh, non-RTO utilities they need to get with their neighbors and put regional plans together.
  • ▶ 18:20 Shayle Kann Okay, so one was, I think, just recently, SPP, Southwest Power Pool, uh, got, I think, approval to build this seven 65 kV transmission backbone, as they called it. 2 times in the scene
  • ▶ 21:37 Rob Gramlich We mentioned SPP, but MISO in the more of the, like, the Great Lakes part of the Midwest, uh, and is looking at seven 65 PJM as well, and they just came out with a new, uh, very much more ambitious plan than we've seen from them.
  • ▶ 24:05 Rob Gramlich Like, we don't really have a system in place to build inter-regional transmission from region to region, MISO to SPP, or 2 times in the scene

Unpacking DOE's proposal to transform data center interconnection Oct 30, 2025 · 2 mentions

  • ▶ 22:20 Tyler Norris It was by E three and they use Southwest power pool as the, as the market.
  • ▶ 34:13 Tyler Norris I don't think they went into that level of specificity, but, um, you know, for example, with what Southwest Power Pool is proposing, I think the metric they use, we'd have to check the final version, but I think it was like, it needs to be…

The new wave of DERs Oct 2, 2025 · 2 mentions

  • ▶ 16:14 Dana Guernsey So you'll have your PJMs and ERCOTs and New York and SPP being bigger than, for example, the Canadian markets.
  • ▶ 29:10 Dana Guernsey It's not the same as what is capacity in MISO or SPP or you name it.

What do you do with a 100-hour battery? Dec 14, 2023 · 1 mention

  • ▶ 39:40 Mateo Jaramillo Uh, we're looking at projects with project owners all throughout SPP, the Southern Power Pool, all throughout MISO, uh, where there's a lot of wind today, uh, and a lot of existing assets that, um, that are in some challenged economic…

Understanding the transmission bottleneck May 4, 2023 · 1 mention

Made with StarZero

Turn any episode into a week of clips.

This entire site, over 200 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.