Southwest Power Pool, every mention
11 scenes · ← back to Southwest Power Pool
tap a year for its mentions
every year anyone Rob Gramlich 5Shayle Kann 3Tyler Norris 2Dana Guernsey 2Mateo Jaramillo 1
Verbatim, from the transcripts: the passages where Southwest Power Pool comes up
PJM and ERCOT navigate a capacity rollercoaster
- ▶ 40:24 Shayle Kann I look forward to the next weird flare-up being in, like, MISO or SPP or New England ISO or CAISO or something like that.
Looking for a turnaround in transmission
- ▶ 8:34 Rob Gramlich So it applies to the, the grid operators like PJM and MISO and SPP and California ISO, but also to the, uh, non-RTO utilities they need to get with their neighbors and put regional plans together.
- ▶ 18:20 Shayle Kann Okay, so one was, I think, just recently, SPP, Southwest Power Pool, uh, got, I think, approval to build this seven 65 kV transmission backbone, as they called it. 2 times in the scene
- ▶ 21:37 Rob Gramlich We mentioned SPP, but MISO in the more of the, like, the Great Lakes part of the Midwest, uh, and is looking at seven 65 PJM as well, and they just came out with a new, uh, very much more ambitious plan than we've seen from them.
- ▶ 24:05 Rob Gramlich Like, we don't really have a system in place to build inter-regional transmission from region to region, MISO to SPP, or 2 times in the scene
Unpacking DOE's proposal to transform data center interconnection
- ▶ 22:20 Tyler Norris It was by E three and they use Southwest power pool as the, as the market.
- ▶ 34:13 Tyler Norris I don't think they went into that level of specificity, but, um, you know, for example, with what Southwest Power Pool is proposing, I think the metric they use, we'd have to check the final version, but I think it was like, it needs to be…
The new wave of DERs
- ▶ 16:14 Dana Guernsey So you'll have your PJMs and ERCOTs and New York and SPP being bigger than, for example, the Canadian markets.
- ▶ 29:10 Dana Guernsey It's not the same as what is capacity in MISO or SPP or you name it.
What do you do with a 100-hour battery?
- ▶ 39:40 Mateo Jaramillo Uh, we're looking at projects with project owners all throughout SPP, the Southern Power Pool, all throughout MISO, uh, where there's a lot of wind today, uh, and a lot of existing assets that, um, that are in some challenged economic…
Understanding the transmission bottleneck
- ▶ 14:43 Rob Gramlich Um, we're seeing that now in some regions like SPP.