Scale Microgrids

company on 1 show · 4 statements across 2 episodes · said 21 times in 10 episodes since 2023

Catalyst 21

Mentions by year, every show

tap a year for its mentions
00831552023202420252026episodesmentions
0352023202420252026episodes it came up in
002.52.5552023202420252026episodesmentions per episode

Catalyst 21

2026 2 mentions in 2 episodes 1 per episode
2025 5 mentions in 5 episodes 1 per episode
2023 14 mentions in 3 episodes 5 per episode

every mention on every show, scene by scene, with the transcript →

4 statements about Scale Microgrids, every show

CATALYST Assertion Supported
Elder: Stripe and Scale study found 1TW+ off-grid potential in Southwest
“There was this foundational study that came out about two years ago that was co-authored by Stripe and Paces and Scale Microgrids, and they found over a terawatt of opportunity in the American Southwest alone, with high levels of renewable development being ab…”
Jake Elder Mar 12, 2026 ▶ 18:58 AI scaling pathways: on grid, on edge, off grid, off planet
CATALYST Assertion Not checkable as stated
Hade: Clean long-duration storage is not remotely economically viable today
“So we're looking into things like, you know, iron air batteries, and nickel hydrogen batteries, and you know, hydrogen as a consumable fuel, right? But nothing even, like, comes remotely close to being economically viable right now for us, right? And so maybe …”
Tim Hade Oct 26, 2023 ▶ 31:34 The market for microgrids
CATALYST Assertion Not checkable as stated
Hade: Economic 24/7 commercial resilience currently requires fossil generation
“I think if you think about an economically viable way to provide commercial and industrial facilities with the type of resilience that most of them are looking for, you're using fossil gas or natural gas or freedom gas plus solar and storage or diesel or propa…”
Tim Hade Oct 26, 2023 ▶ 29:46 The market for microgrids
CATALYST Assertion Supported
Hade: Switchgear lead times surged from 20 to 60-70 weeks post-COVID
“Which is typically, like, 20 week lead times on Switchgear. That was kind of what the market was before COVID. Today, it's more like 60 to 70 weeks.”
Tim Hade Oct 26, 2023 ▶ 12:50 The market for microgrids

← every entity, every show

Made with StarZero

Turn any episode into a week of clips.

This entire site, thousands of episodes across every show transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.