Bob's Red Mill facility

part of Bob's Red Mill

1 statements across 1 episodes · 0 bullish · 0 bearish · 1 people on the record · first statement Jul 1, 2019 by Dave Dahl · across every show →

Everything said about Bob's Red Mill facility, oldest first

Jul 1, 2019
Assertion Not checkable as stated
Dave Dahl: Relocating production cost $1.5M with zero supporting cash flow
“It cost us a million and a half to move to this new facility, and a million and a half to us then was a lot of money. And there was no cash flow to support that. It was all based on the future.”
Dave Dahl Jul 1, 2019 ▶ 41:18 Dave's Killer Bread: Dave Dahl
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 800 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.