why aren't all 12 resolved? a statement only gets an assessment when the public record can support or contradict it. opinions and what-ifs never can, and 2 checkable ones are still open, waiting for their date. predictions held up or didn't; assertions are supported or contradicted. on every card: ▮▮▮▮▮ certainty · ▮▮▮▮▮ debate potential. speakers are clickable

Prediction Not checkable as stated
Behind-the-meter nuclear data centers have no credible case for decades
“I don't think there's a credible argument for behind the meter nuclear at a data center in the near future. And by near future, I mean, The next couple of decades.”
Brian Janous Sep 12, 2025 ▶ 35:44 When to colocate data centers with generation
Prediction Not checkable as stated
Janous: US data center constraints will persist through 2030 and beyond
“All the stuff we thought we were going to build in this country, or thought we could build, a lot of that's not going to get built, because of all the things we've just been talking about. Like, I think that, and this problem is going to persist for the forese…”
Brian Janous Sep 3, 2026 ▶ 40:30 What comes after the data center backlash?
Prediction Not checkable as stated
Janous: Vast majority of computation will remain in 100MW+ data centers
“I still believe that the vast majority of the computation is going to be done in large data centers. Large being defined as hundred megawatts or more in my world.”
Brian Janous Sep 3, 2026 ▶ 44:52 What comes after the data center backlash?
Prediction Not checkable as stated
Janous: Compute demand will exceed available power supply through 2030.
“It's possible, though I suspect that given the, my fundamental belief is that the demand for compute, let's just say through twenty-thirty, will exceed the available power in the market. And therefore, the marginal value of the next watt or gigawatt, frankly, …”
Brian Janous Dec 5, 2024 ▶ 23:47 Explaining the 'Watt-Bit Spread'
Prediction Open · timeframe Jun 2034
Janus: AEP will not connect 90 gigawatts in next decade
“There's no reason to believe that AEP is going to connect 90 gigawatts in the next 10 years.”
Brian Janous Jun 13, 2024 ▶ 13:35 Under the hood of data center power demand
Prediction Not checkable as stated
Janus: AI Training Loads Will Not Run as Intermittent Renewable-Following Workloads
“So I think it's a little bit overblown to say, and I think this is also true of Something like the conversation around crypto, but that these are highly curtailable loads that you could just, you know, attach a training model to a wind farm and only run it, yo…”
Brian Janous Jun 13, 2024 ▶ 22:39 Under the hood of data center power demand
Prediction Not checkable as stated
Janus: Nuclear Power Will Not Solve Data Center Bottlenecks This Decade
“The focus that these companies have right now is getting data centers online in the next, Two, three, four years, and nuclear is not going to solve that problem.”
Brian Janous Jun 13, 2024 ▶ 28:31 Under the hood of data center power demand
Prediction Not checkable as stated
Janus: Hyperscaler climate targets are probably not achievable on time
“And so there is, I think at this point, a point of coming to grips with the fact that those targets are probably not achievable in the time horizons that they had all set.”
Brian Janous Jun 13, 2024 ▶ 37:59 Under the hood of data center power demand
Prediction Not checkable as stated
Virtual power plants will soon bridge grid capacity for large data centers
“So it does take some work to get it, and you're right, no one's done it at a, at any real scale yet but I think we're gonna see it pretty soon.”
Brian Janous Sep 12, 2025 ▶ 30:49 When to colocate data centers with generation
Prediction Not checkable as stated
Land constraints will keep on-site renewables a niche data center solution
“That's still going to be a relatively small percentage of the overall market because we can't put everything in West Texas, right? We still are going to have The tendency to want to be closer to major metros where that sort of land availability is going to be …”
Brian Janous Sep 12, 2025 ▶ 33:38 When to colocate data centers with generation
Prediction Not checkable as stated
Janous: Building simultaneous remote gigawatt data centers will cause severe labor delays.
“But if all, if too many people try to do that all at once, you're going to create a labor problem and you're going to have significant delays in getting a lot of this infrastructure stood up.”
Brian Janous Dec 5, 2024 ▶ 11:18 Explaining the 'Watt-Bit Spread'
Prediction Open · timeframe Dec 2030
Janous: Terrestrial data centers will remain the vast majority through 2030
“I just look at the pie of total data centers by 20 30 and pick your date in the future. I'm a big believer of terrestrial data centers are still going to be, like, the vast majority of the way we build data centers. Like, I just don't, I'm not sure how much it…”
Brian Janous Sep 3, 2026 ▶ 37:16 What comes after the data center backlash?
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 200 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.