NextEra Energy

also referred to as: nextera

4 statements across 2 episodes · 1 bullish · 1 bearish · 2 people on the record · first statement Oct 16, 2025 by Akshat Rathi · said 22 times in 9 episodes since 2022 · across every show →

Mentions by year

brought up most by Maeve Allsup (9), Shayle Kann (8), Rob Hanson (3), Julian Dumoulin-Smith (1), Akshat Rathi (1)

tap a year for its mentions
005210420222023202420252026episodesmentions
02420222023202420252026episodes it came up in
005210420222023202420252026episodesmentions per episode
2026 9 mentions in 1 episode
2025 6 mentions in 4 episodes 2 per episode
2024 1 mention in 1 episode
2023 3 mentions in 2 episodes 2 per episode
2022 3 mentions in 1 episode

every mention, scene by scene, with the transcript →

Everything said about NextEra Energy, oldest first

Oct 16, 2025 bullish
Assertion Not checkable as stated
NextEra CEO: Expensive gas turbines make solar-plus-storage much more attractive
“We spoke to a utility CEO, the NextEra CEO in the US, who said, you know, if gas turbines are going to be that expensive, that's just going to make solar plus batteries so much more attractive, and we'll build those instead.”
Akshat Rathi Oct 16, 2025 ▶ 15:34 Calibrating hype with Akshat Rathi
Jun 25, 2026 bearish
Opinion
Allsup: Early opposition makes 2029 Mid-Atlantic transmission target unlikely
“The level of opposition, the force of that opposition at such an early stage, relatively I, I'm less than optimistic, I guess, about this particular project. I do think maybe a lot will depend on what FERC does in this parallel proceeding, but I feel like they…”
Maeve Allsup Jun 25, 2026 ▶ 28:38 How data centers are complicating transmission expansion
Jun 25, 2026 neutral
Assertion Supported
NextEra plans 100-mile Mid-Atlantic transmission line across PJM
“It's a planned high voltage transmission line spanning about a 107, I think a little over a hundred miles in PJM. It would run from Southwestern Pennsylvania to Northern Virginia, crossing through Maryland and also a good chunk of West Virginia. It's being dev…”
Maeve Allsup Jun 25, 2026 ▶ 4:17 How data centers are complicating transmission expansion
Jun 25, 2026 neutral
Assertion Supported
NextEra aims to begin Mid-Atlantic Reliability Line construction in 2029
“They want to start construction in 2029, and the systems to make sure that data center customers can pay for that just don't exist.”
Maeve Allsup Jun 25, 2026 ▶ 14:11 How data centers are complicating transmission expansion
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 200 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.