kilowatts

1 statements across 1 episodes · 0 bullish · 0 bearish · 1 people on the record · first statement Aug 6, 2026 by Raymond Hawkins · across every show →

Everything said about kilowatts, oldest first

Aug 6, 2026
Insight
Hawkins: Data center rent is billed per kilowatt because power limits facilities
“The reason we charge rent based on, on kilowatts is it is the limiting factor in the building.”
Raymond Hawkins Aug 6, 2026 ▶ 8:55 The electrician shortage slowing the AI boom
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 200 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.