Kilowatts

topic on 1 show · 1 statements across 1 episodes

Catalyst

1 statements about Kilowatts, every show

CATALYST Insight
Hawkins: Data center rent is billed per kilowatt because power limits facilities
“The reason we charge rent based on, on kilowatts is it is the limiting factor in the building.”
Raymond Hawkins Aug 6, 2026 ▶ 8:55 The electrician shortage slowing the AI boom

← every entity, every show

Made with StarZero

Turn any episode into a week of clips.

This entire site, thousands of episodes across every show transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.