Reconductoring

topic on 2 shows · 3 statements across 3 episodes

Catalyst the Green Blueprint

3 statements about Reconductoring, every show

CATALYST Assertion Supported
Kann: Full NEPA reviews are no longer required for transmission reconductoring
“You don't need to go through a full NEPA review anymore. You used to do a full NEPA review for any, ah, reconductoring over 20 miles, I believe, and now it is any reconductoring of any length.”
Shayle Kann May 8, 2024 ▶ 17:24 The news quiz episode!
GREEN BLUEPRINT Assertion Supported
Kann: Federal rules now exempt all reconductoring from full NEPA review
“You used to do a full NEPA review for any, ah, reconductoring over 20 miles, I believe, and now it is any reconductoring of any length.”
Shayle Kann May 8, 2024 ▶ 15:59 The news quiz episode!
GREEN BLUEPRINT Assertion Supported
Shah: Advanced reconductoring can triple existing electric grid capacity
“Replacing the existing wire with fantastic new wire that can three X the current grid capacity.”
Jigar Shah May 1, 2023 ▶ 46:11 America’s green industrial strategy 2.0

← every entity, every show

Made with StarZero

Turn any episode into a week of clips.

This entire site, thousands of episodes across every show transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.