Pad Mounted Transformers

topic on 1 show · 1 statements across 1 episodes

Catalyst

1 statements about Pad Mounted Transformers, every show

CATALYST Assertion Supported
Mills: Pad-mounted transformer lead times reach as long as two years
“But those pad bound transformers, both single phase and three phase, still pretty darn long. I've seen things as long as two years right now on either.”
Tim Mills Feb 22, 2024 ▶ 7:48 The electric transformer shortage

← every entity, every show

Made with StarZero

Turn any episode into a week of clips.

This entire site, thousands of episodes across every show transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.