Mira, every mention

14 scenes · ← back to Mira

tap a year for its mentions
001513022026episodesmentions
0122026episodes it came up in
007.511522026episodesmentions per episode

every year anyone Eric Romo 16Tom Mueller 13Molly O'Shea 1

Verbatim, from the transcripts: the passages where Mira comes up

loading…

Tom Mueller: SpaceX's #1 Employee Built the Merlin Engine. Now He's Building Impulse Space · Sourcery with Molly O'Shea Jun 4, 2026 · 13 mentions

  • ▶ 2:52 Tom Mueller So this is set up for high production rate for Mira and the other spacecraft. 2 times in the scene
  • ▶ 4:23 Tom Mueller All right, well, starting here, um, this is, uh, the Mira. 4 times in the scene
  • ▶ 9:42 Tom Mueller We named all, and the little, the little engines that you see on Mira are safe.
  • ▶ 16:09 Tom Mueller So here they are, we're making, these are, these are tanks, uh, for the Mira spacecraft.
  • ▶ 22:12 Tom Mueller Um, the, the Mira chassis, all that aluminum on the Mira is made right here on this machine. 3 times in the scene
  • ▶ 27:50 Tom Mueller One of the safes, the, the six pound thrusters that we use on Mira, and it's in a vacuum chamber, and it's sitting right now at, um, at about six tor, uh, atmosphere, seven 60 tor, so we're six, seven sixties of atmosphere, so it's got a… 2 times in the scene

Why Impulse Raised $500M to Move Things in Space | President & COO Eric Romo · Sourcery with Molly O'Shea Jun 2, 2026 · 17 mentions

  • ▶ 0:16 Eric Romo We've got our Mira product line, which is now scaling to where we have to build one of those per month.
  • ▶ 2:09 Eric Romo Um, uh, and then in defense with our product Mira, um, and then we hope to have a business around NASA.
  • ▶ 7:36 Eric Romo We've got our, our Mira, uh, product line, which is now scaling to where we have to build one of those per month, uh, at this point.
  • ▶ 9:41 Eric Romo Um, when I got here, the company had been working on the Mira vehicle for a little while, and, um, it had, Mira went from not existing to, uh, being built and ready to fly in about 14 months, so really, really fast, which is testament to… 10 times in the scene
  • ▶ 16:20 Molly O'Shea So I know we talked about this in our New York Stock Exchange Space Summit hot takes, um, the breakdown of the products, Mira, Helios, and Caravan, and then the customer sets within them.
  • ▶ 30:11 Eric Romo The practical reality is that the product market fit for MIRA, for a high thrust, high Delta V space vehicle,
  • ▶ 34:19 Eric Romo And so, MIRA spacecraft is really good at this, at going from one part of GEO to another, um, because as it's really, really big, uh, and so
  • ▶ 47:10 Eric Romo Um, we've got to continue to produce Miras.
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 160 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.