Justin Lopez

2 statements across 1 episodes · 0 bullish · 0 bearish · 1 people on the record · first statement Aug 3, 2026 by Justin Lopas · said 6 times in 3 episodes since 2025 · across every show →

Mentions by year

brought up most by Packy McCormick (3), David Ulevitch (2), Molly O'Shea (1)

tap a year for its mentions
00315220252026episodesmentions
01220252026episodes it came up in
001.312.5220252026episodesmentions per episode

every mention, scene by scene, with the transcript →

Everything said about Justin Lopez, oldest first

Aug 3, 2026
Assertion Not checkable as stated
Lopez: Base Power built its Austin production line in under six months
“So we moved in here in September, October of last year. But the production line really only got started, started getting built in February or March of this year. So like where we're standing right here, all of this, Is, is, you know, less than six months old.”
Justin Lopas Aug 3, 2026 ▶ 1:21 Inside the Factory Behind Base Power's $1B Series D
Aug 3, 2026
Disclosure
Lopez: Base Power employs 100 factory workers and plans second shift
“We've got about a hundred now. Yeah, we got about a hundred, and then we're gonna be starting a second shift.”
Justin Lopas Aug 3, 2026 ▶ 1:58 Inside the Factory Behind Base Power's $1B Series D
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 160 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.