The Critical Path

0 statements across 0 episodes · 0 bullish · 0 bearish · 0 people on the record · said 1 times in 1 episodes since 2022 · across every show →

Mentions by year

brought up most by Kristian Tapaninaho (1)

tap a year for its mentions
0011112022episodesmentions
0112022episodes it came up in
000.50.5112022episodesmentions per episode
2022 1 mention in 1 episode

every mention, scene by scene, with the transcript →

Everything said about The Critical Path, oldest first

Nothing matches those filters. clear them

Made with StarZero

Turn any episode into a week of clips.

This entire site, over 800 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.