George Hershman, CEO of utility-scale solar EPC SOLV Energy, describes how the company applies AI simulation models to multi-square-mile project sites.
0:00 / 0:52exact quote · 52.7s
720p mp4 · rendered on demand · StarZero watermark
“All those things we're looking at and using AI to run those type of simulations so that we don't have to build it and then determine that we would have done it differently. We can run, we can put plans in, we can put in mobilization plans and do a lot of simulation around how best to move equipment What happens if you know, what if you park them in the north corner versus the south corner? How close is their work area? What if you do two lay down areas and not one lay down area? How many moves will that eliminate in or minimize during the course of a project? And all of those can be done through simulations now where we used to have to kind of measure them in real time.”
quote is from the automated transcript, cleaned for reading:
filler sounds and stutters are removed, nothing is rephrased. names can be misheard
(the analysis reads context, assessments check outside sources). how →
More from George Hershman
AssertionSupported
Hershman: 85% of solar labor is mechanical, not skilled electrical
“If you think about a solar project,
You know, probably 85 to 90% of that is really, you know, labor and mechanical labor, right?
You are, we're putting posts in the ground, we're bolting together racking systems, and we're installing modules.
And then, you kno…”
George HershmanApr 30, 2026▶ 12:04How AI is modernizing EPCs
Insight
Hershman: Solar installation is closer to manufacturing than traditional construction
“I think we look at our business much more akin to manufacturing than we look at it as construction, right?
You think about, we are, we're trying to do this, a, the same activity a million times, and how do we do that just
Slightly more efficient.”
George HershmanApr 30, 2026▶ 16:09How AI is modernizing EPCs
Insight
Hershman: Truck logistics, not labor, is solar construction's primary bottleneck
“The amount of trucks that we have to move becomes the gating activity, not the amount of people, right?”
George HershmanApr 30, 2026▶ 20:34How AI is modernizing EPCs
Opinion
Hershman: Human labor is still faster than construction robotics
“On a one-for-one basis, you know, I can still use human capital and labor, right? To produce faster than robotics that are out there in the market?”
George HershmanApr 30, 2026▶ 22:38How AI is modernizing EPCs
Insight
Hershman: Just-in-time delivery fails on utility-scale solar projects
“There is no just-in-time delivery on these projects. If you do just-in-time delivery, like, that was the whole mantra of our, the commercial, my commercial life when I was building commercial construction, is that you are on small constrained sites, and you wo…”
George HershmanApr 30, 2026▶ 26:29How AI is modernizing EPCs
AssertionSupported
SOLV Energy manages over 20 GW of US projects
“We manage Over 20 gigawatts of projects across the country.”
This entire site, over 200 episodes transcribed, diarized, checked and made playable,
runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the
moments worth sharing, cuts them, captions them, and reframes them for every feed.
We use essential cookies to make the site work. With your permission we
also use analytics cookies (Google Analytics and Mixpanel) to understand
usage and improve StarZero. See our Cookie Policy.