Insight certainty 4/5 debate potential 2/5

Hershman: Just-in-time delivery fails on utility-scale solar projects

George Hershman · How AI is modernizing EPCs · Apr 30, 2026 · at 26:29

SOLV Energy CEO George Hershman explains why utility-scale solar construction cannot use traditional commercial construction logistics.

0:00 / 0:36exact quote · 36.4s
720p mp4 · rendered on demand · StarZero watermark
“There is no just-in-time delivery on these projects. If you do just-in-time delivery, like, that was the whole mantra of our, the commercial, my commercial life when I was building commercial construction, is that you are on small constrained sites, and you would deliver just-in-time, because you couldn't move material around, and you needed it there when you needed, the day before you needed to install it. If we do that on these projects, we're late because the momentum is going so fast that we need to deliver early”

quote is from the automated transcript, cleaned for reading: filler sounds and stutters are removed, nothing is rephrased. names can be misheard (the analysis reads context, assessments check outside sources). how →

More from George Hershman

Assertion Supported
Hershman: 85% of solar labor is mechanical, not skilled electrical
“If you think about a solar project, You know, probably 85 to 90% of that is really, you know, labor and mechanical labor, right? You are, we're putting posts in the ground, we're bolting together racking systems, and we're installing modules. And then, you kno…”
George Hershman Apr 30, 2026 ▶ 12:04 How AI is modernizing EPCs
Insight
Hershman: Solar installation is closer to manufacturing than traditional construction
“I think we look at our business much more akin to manufacturing than we look at it as construction, right? You think about, we are, we're trying to do this, a, the same activity a million times, and how do we do that just Slightly more efficient.”
George Hershman Apr 30, 2026 ▶ 16:09 How AI is modernizing EPCs
Insight
Hershman: Truck logistics, not labor, is solar construction's primary bottleneck
“The amount of trucks that we have to move becomes the gating activity, not the amount of people, right?”
George Hershman Apr 30, 2026 ▶ 20:34 How AI is modernizing EPCs
Opinion
Hershman: Human labor is still faster than construction robotics
“On a one-for-one basis, you know, I can still use human capital and labor, right? To produce faster than robotics that are out there in the market?”
George Hershman Apr 30, 2026 ▶ 22:38 How AI is modernizing EPCs
Assertion Supported
SOLV Energy manages over 20 GW of US projects
“We manage Over 20 gigawatts of projects across the country.”
George Hershman Apr 30, 2026 ▶ 7:07 How AI is modernizing EPCs
Assertion Supported
Hershman: SOLV Energy solar projects now average over 300 megawatts
“Now those projects are, you know, averaging over 300 megawatts and up to a gigawatt in scale.”
George Hershman Apr 30, 2026 ▶ 9:05 How AI is modernizing EPCs
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 200 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.