Prediction certainty 3/5 debate potential 3/5

Kann: Carbon removal startup oversupply will force a market reckoning

Shayle Kann · 2025 trends: aerosols, oil demand, and carbon removal · Jan 30, 2025 · at 32:14

Climate tech investor Shail (Shayle) Kann discusses why the voluntary carbon and carbon dioxide removal (CDR) markets face a looming correction.

0:00 / 0:24exact quote · 24.3s
720p mp4 · rendered on demand · StarZero watermark
“I think the overwhelming likelihood is that we're in for a bit of a reckoning in that market. In that market, I mean, both the general voluntary carbon market, and more specifically, the CDR market. Not to say everything fails, but there's just the, there's an oversupply of startups for sure. And the buyer pool has not expanded as much as you would like it to have in order to see the up and to the right trajectory on the demand side.”

quote is from the automated transcript, cleaned for reading: filler sounds and stutters are removed, nothing is rephrased. names can be misheard (the analysis reads context, assessments check outside sources). how →

More from Shayle Kann

Prediction Not checkable as stated
Kann: Electric vehicles will never discharge to the grid at scale
“I do not think we'll ever see vehicles discharging into the grid at scale.”
Shayle Kann Jun 23, 2022 ▶ 34:45 Which tech is overhyped, underhyped and just right?
Assertion Supported
Kann: Sulfur injection could cool Earth 0.5°C for $2 billion
“Specifically, you might be able to get about a half a degree Celsius of global cooling out of stratospheric sulfur injection for a couple of billion dollars, which is nothing, basically, comparatively.”
Shayle Kann Jun 16, 2022 ▶ 4:22 Making sense of solar engineering
Assertion Contradicted
Kann: Software engineering is the only job category truly displaced by AI to date
“And in fact, the only jobs that have been lost really because of AI to date are like software engineers.”
Shayle Kann Sep 3, 2026 ▶ 17:03 What comes after the data center backlash?
Opinion
Kann: V2G economics do not pencil for EV drivers with $7,000 hardware
“GM, for example, their bi-directional charging bundle runs about 7000 dollars before installation. And grid programs so far have paid drivers a lot less than that. It just doesn't pencil.”
Shayle Kann Jul 23, 2026 ▶ 1:50 The multi-billion dollar promise of vehicle-to-grid integration
Opinion
Kann: Power is the rate limiter to AI growth
“And understanding the multiple factors that drive failure of new transmission, I think, is key to understanding why power is, in my opinion, The rate limiter to AI growth, and why upward pressure on electricity prices will probably sustain for a while.”
Shayle Kann Jun 25, 2026 ▶ 0:30 How data centers are complicating transmission expansion
Assertion Partly supported
Kann: Almost none of the 50 GW data center pipeline is off-grid
“There's like, 50 gigawatts of behind-the-meter generation and development at data centers, right? And they, and some people have interpreted that to be, oh, 50 gigawatts of off-grid data centers getting built. It's actually close to zero of those that are true…”
Shayle Kann Mar 12, 2026 ▶ 9:42 AI scaling pathways: on grid, on edge, off grid, off planet
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 200 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.