Terawatt Infrastructure

12 statements across 2 episodes · 6 bullish · 0 bearish · 1 people on the record · first statement Jul 28, 2022 by Neha Palmer · said 57 times in 2 episodes since 2022 · across every show →

Mentions by year

brought up most by Emily Kirsch (26), Lara Pierpoint (21), Neha Palmer (4), Shayle Kann (3), Daniel Waldorf (3)

tap a year for its mentions
001513012022202320242025episodesmentions
0112022202320242025episodes it came up in
00150.53012022202320242025episodesmentions per episode
2025 28 mentions in 1 episode
2022 29 mentions in 1 episode

every mention, scene by scene, with the transcript →

Everything said about Terawatt Infrastructure, oldest first

Jul 28, 2022 neutral
Assertion Not checkable as stated
Palmer: Fleet EV hubs require 5 to 50 megawatts of power
“So, you know, in urban locations, it could be, you know, in the five to 10 megawatt range and more, you know, looking at larger format batteries you could be in the tens of megawatts, call it 40, 50 megawatts of demand in one location.”
Neha Palmer Jul 28, 2022 ▶ 23:22 Watt It Takes: TeraWatt Infrastructure CEO Neha Palmer
Jul 28, 2022 positive
Insight
Palmer: EV fleet charging hubs require the same skills as data centers
“I realized, you guys are building a data center. It was like the two by four moment where I realized, I've already done this, and this is exactly the type of skill that you need to build these large EV charging stations.”
Neha Palmer Jul 28, 2022 ▶ 17:52 Watt It Takes: TeraWatt Infrastructure CEO Neha Palmer
May 15, 2025
Disclosure
Palmer: Terawatt Installs Extra Underground Capacity to Future-Proof Sites
“You don't see what's happening below ground, which is massive duck banks. We oftentimes put in extra capacity. So when the charger power might go up, we would have the capability to actually make that change over pretty quickly. So future proofing underground.”
Neha Palmer May 15, 2025 ▶ 18:23 Terrawatt Infrastructure’s billion-dollar strategy
May 15, 2025 bullish
Disclosure
Palmer: Terawatt will have three California charging sites live this year
“In California, we have built what I think is the best network of sites, and three of them will be live this year, with the port of L.A. Long Beach site being the first one.”
Neha Palmer May 15, 2025 ▶ 4:49 Terrawatt Infrastructure’s billion-dollar strategy
May 15, 2025 bullish
Disclosure
Terawatt plans freight EV charging corridor from Long Beach to El Paso
“We call it kind of a corridor, but it would start in the port of Long Beach and go all the way to El Paso, Texas. And so allowing somebody in an EV truck to travel that Confidently, knowing that they had charging along the way that would accommodate the range …”
Neha Palmer May 15, 2025 ▶ 10:42 Terrawatt Infrastructure’s billion-dollar strategy
May 15, 2025 neutral
Insight
Charging infrastructure timelines mismatch with 6-to-12-month fleet vehicle procurement cycles
“That said, what's interesting is it takes us, call it, 18 months to 24 months to find a site, get it entitled, permitted, constructed, and then operational. Most vehicles make vehicle purchasing decisions at the most a year in advance, sometimes six months in …”
Neha Palmer May 15, 2025 ▶ 28:44 Terrawatt Infrastructure’s billion-dollar strategy
May 15, 2025 positive
Assertion Supported
Palmer: Terawatt Secured Seven Megawatts of Immediate Power for Long Beach Site
“This site also had something really incredible where you don't find this in many locations, which is seven megawatts of power available from day one.”
Neha Palmer May 15, 2025 ▶ 25:02 Terrawatt Infrastructure’s billion-dollar strategy
May 15, 2025 positive
Disclosure
Terawatt to open an Inland Empire charging site in summer 2025
“We have our next site that will come online in the summertime that will be in the Inland Empire, which is after a vehicle goes to the port, it generally goes to the Inland Empire which is the, you know, giant warehouse district for the port here in California.…”
Neha Palmer May 15, 2025 ▶ 32:12 Terrawatt Infrastructure’s billion-dollar strategy
May 15, 2025 neutral
Prediction Not checkable as stated
Terawatt CEO: Building EV charging network requires multiple billion-dollar raises
“The billion dollars is not gonna last that long to build that many assets, and so it was really the vision from the beginning that this is not just a small-scale effort, it's going to be something that requires significant capital, and they'll have to be multi…”
Neha Palmer May 15, 2025 ▶ 8:04 Terrawatt Infrastructure’s billion-dollar strategy
May 15, 2025 positive
Disclosure
TeraWatt optimized Rancho Dominguez site for pull-through charging stalls
“We landed kind of on a compromise but we wanted to optimize the site for the pull through. So we got as many pull throughs on the site as possible. And then when we had more power and space left, we added in some bobtail charging.”
Neha Palmer May 15, 2025 ▶ 27:32 Terrawatt Infrastructure’s billion-dollar strategy
May 15, 2025
Assertion Supported
Terawatt: LAX hub secured five megawatts of day-one utility power
“So, it had five megawatts of power that was available from day one. We just had to start construction on our site, and the utility had to do a little bit of construction on their end. But, we knew that we could get that power from day one to allow us to serve …”
Neha Palmer May 15, 2025 ▶ 12:34 Terrawatt Infrastructure’s billion-dollar strategy
May 15, 2025 neutral
Insight
EV charging depots are overengineered for simultaneous peak power draws
“These sites are designed for every vehicle to come in at the exact same time. It'd be the top of the charge curve pulling the full power of the charger at the same time, and that just doesn't happen.”
Neha Palmer May 15, 2025 ▶ 35:39 Terrawatt Infrastructure’s billion-dollar strategy
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 200 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.