Electricity transmission infrastructure

1 statements across 1 episodes · 0 bullish · 0 bearish · 1 people on the record · first statement Apr 23, 2026 by Shayle Kann · across every show →

Everything said about Electricity transmission infrastructure, oldest first

Apr 23, 2026
Assertion Supported
Google's 2026 CapEx is 5-7x the entire US transmission spend
“We spend about 25 or thirty-five billion dollars a year in capex on transmission. Electricity transmission infrastructure in the United States, so this is five to seven times that amount, just from Google, just in one year.”
Shayle Kann Apr 23, 2026 ▶ 2:52 Inside Google’s massive AI capex (live)
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 200 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.