Bloom Energy

5 statements across 2 episodes · 3 bullish · 0 bearish · 2 people on the record · first statement Aug 17, 2023 by Andy Lubershane · said 2,123 times in 230 episodes since 2021 · across every show →

Mentions by year

brought up most by Stephen Lacey (196), Shayle Kann (70), Sponsor Voiceover (Bloom Energy & Engie) (20), Commercial Narrator (Bloom Energy / Engie) (20), Ad Narrator (Bloom Energy & Engie) (19), Sponsor Narrator (Bloom Energy & Engie) (10), K.R. Sridhar (9), Garth Sheldon-Coulson (9)

tap a year for its mentions
002502550050202120222023202420252026episodesmentions
02550202120222023202420252026episodes it came up in
005251050202120222023202420252026episodesmentions per episode
2026 334 mentions in 35 episodes 10 per episode
2025 455 mentions in 50 episodes 9 per episode
2024 413 mentions in 45 episodes 9 per episode
2023 424 mentions in 46 episodes 9 per episode
2022 443 mentions in 48 episodes 9 per episode
2021 54 mentions in 6 episodes 9 per episode

every mention, scene by scene, with the transcript →

Everything said about Bloom Energy, oldest first

Aug 17, 2023 neutral
Assertion Supported
Lubbershane: Amazon turns to Bloom Energy fuel cells for Oregon data centers
“Amazon announced that they've got these three new data centers in Oregon that they're going to be, at least for the short term, powering with fuel cells from Bloom Energy, natural gas powered fuel cells. And part of that is because they just can't get connecte…”
Andy Lubershane Aug 17, 2023 ▶ 14:08 Navigating the electricity gauntlet
Oct 21, 2025 bullish
Assertion Not checkable as stated
Sridhar: Data center developer interest in off-grid power jumped from 1% to 29%
“18 months ago, the survey, you know, like respondents said, one percent of the survey respondents said they will use on-site power that is not connected to the grid. Two months ago when we did the same survey, 29% of the respondents said they will use on-site …”
K.R. Sridhar Oct 21, 2025 ▶ 3:41 Frontier Forum: The new power map for AI infrastructure
Oct 21, 2025 bullish
Prediction Held up
Sridhar: Data centers will shift to 800-volt DC architecture
“The second pain point that they are working on as we speak is shifting the mindset to an 800 volt DC bus going into Iraq. Let me explain this to you. When you are a large power plant that produces 50 megawatts, 500 megawatts worth of power, because so much pow…”
K.R. Sridhar Oct 21, 2025 ▶ 17:39 Frontier Forum: The new power map for AI infrastructure
Oct 21, 2025 neutral
Assertion Supported
Sridhar: AI computing loads rapidly swing between 10% and 100% capacity
“The AI load, unlike the CPU load, is very volatile. It has milliseconds, seconds, and minutes variation that go from 10% of a load to a hundred percent of the load. So you're talking about, if it's a hundred megawatt data center as an example, you're talking a…”
K.R. Sridhar Oct 21, 2025 ▶ 16:42 Frontier Forum: The new power map for AI infrastructure
Oct 21, 2025 positive
Insight
Sridhar: Data centers should always connect to the grid for cheap insurance
“Anytime a customer can connect to a grid, they would want to, and we would recommend that they connect to the grid, because that's insurance for almost nothing.”
K.R. Sridhar Oct 21, 2025 ▶ 28:37 Frontier Forum: The new power map for AI infrastructure
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 200 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.