Power Grid Siting

topic on 1 show · 1 statements across 1 episodes

Catalyst

1 statements about Power Grid Siting, every show

CATALYST Prediction Not checkable as stated
Kann: Large industrial power consumers face higher costs and difficult siting
“If you're a large industrial electricity load and you want to site a new plant, you are way at the back of the queue right now. One, you're going to pay more, and two, siting is going to get really, really hard.”
Shayle Kann Oct 23, 2025 ▶ 16:59 Five big questions about the future of energy

← every entity, every show

Made with StarZero

Turn any episode into a week of clips.

This entire site, thousands of episodes across every show transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.