Modular Construction

topic on 1 show · 1 statements across 1 episodes

All-In

1 statements about Modular Construction, every show

ALL-IN Assertion Not checkable as stated
Mahan: Modular construction cuts home costs by 20% and speeds timelines 50%
“They can bring down the cost per unit by 20%, speed up overall project timelines by up to 50% by just industrializing the production of housing.”
Matt Mahan Mar 23, 2026 ▶ 26:24 How Matt Mahan Thinks He Can Save California

← every entity, every show

Made with StarZero

Turn any episode into a week of clips.

This entire site, thousands of episodes across every show transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.