Interconnection Requests

topic on 1 show · 3 statements across 3 episodes

Catalyst

3 statements about Interconnection Requests, every show

CATALYST Assertion Supported
Rappahannock Electric received interconnection requests four times its total summer peak load
“So they said, hi, we have a 1.2 gigawatt summer peak load. We have individual Interconnection requests that are four times that size.”
Nat Bullard Jul 3, 2025 ▶ 9:12 Fresh intel from state utility regulatory filings
CATALYST Assertion Supported
Bullard: Rappahannock received single interconnection requests 4x its peak load
“Rappahannock had this filing in, in Virginia, where they basically are saying, look, like, we are now getting requests for interconnection. That in a single location are bigger than our entire peak load right now. We have a peak load of 1.2 gigawatts. We have …”
Nat Bullard Feb 6, 2025 ▶ 42:17 More 2025 trends: DeepSeek, plug-in hybrids, and curtailment
CATALYST Assertion Supported
Norris: US power project interconnection time has doubled to four-plus years
“And at the same time, we've seen, and this has been documented by Lawrence Berkeley National Lab, the time required to interconnect has approximately doubled from around 15 years ago. So it used to be that the typical duration from interconnection requests to …”
Tyler Norris Sep 21, 2023 ▶ 9:31 Fixing interconnection