Hydropower Megaprojects

topic on 1 show · 1 statements across 1 episodes

Catalyst

1 statements about Hydropower Megaprojects, every show

CATALYST Assertion Partly supported
Schneider: Hydropower megaprojects take 10 to 15 years to build
“They take a very long time. We're talking 10 to 15 years to build, and that time compounds the cost estimation challenge because a lot of things can happen in 10 years.”
Gia Schneider Apr 20, 2023 ▶ 18:43 How to build more hydropower

← every entity, every show

Made with StarZero

Turn any episode into a week of clips.

This entire site, thousands of episodes across every show transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.