GPU Data Center

topic on 1 show · 1 statements across 1 episodes

the a16z Podcast

1 statements about GPU Data Center, every show

a16z Insight
Patel: Capital equipment represents 80% of Blackwell data center costs
“80% of the cost of a GPU data center if you're building Blackwell is capital. Yeah. Right? It's the GPU purchases, it's the networking, it's the physical data center conversion, power conversion equipment. All of this stuff is like 80% of the cost. And then, 2…”
Dylan Patel Aug 18, 2025 ▶ 47:30 Dylan Patel on GPT-5’s Router Moment, GPUs vs TPUs, Monetization

← every entity, every show

Made with StarZero

Turn any episode into a week of clips.

This entire site, thousands of episodes across every show transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.