Full Wrap EPC

topic on 1 show · 1 statements across 1 episodes

the Green Blueprint

1 statements about Full Wrap EPC, every show

Jewett: Fervo initially planned to outsource power facility construction to EPCs
“We originally believed that we would contract it out. We believed we were a subsurface innovation company, and we would get to Greenfield Developments. We would build out the subsurface, and then we would basically use a full wrap EPC on the top side.”
Sarah Jewett May 21, 2025 ▶ 32:16 Building Fervo's geothermal giant

← every entity, every show

Made with StarZero

Turn any episode into a week of clips.

This entire site, thousands of episodes across every show transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.