full wrap EPC

1 statements across 1 episodes · 0 bullish · 0 bearish · 1 people on the record · first statement May 21, 2025 by Sarah Jewett · across every show →

Everything said about full wrap EPC, oldest first

May 21, 2025 neutral
Disclosure
Jewett: Fervo initially planned to outsource power facility construction to EPCs
“We originally believed that we would contract it out. We believed we were a subsurface innovation company, and we would get to Greenfield Developments. We would build out the subsurface, and then we would basically use a full wrap EPC on the top side.”
Sarah Jewett May 21, 2025 ▶ 32:16 Building Fervo's geothermal giant
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 100 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.