Combined Cycle Generation Systems

topic on 1 show · 1 statements across 1 episodes

Catalyst

1 statements about Combined Cycle Generation Systems, every show

CATALYST Assertion Supported
Piper: Combined-cycle gas plant lead times now stretch to 2030–2032
“The run on gas turbines is such that you can't deploy very many of them next year, or even two years from now. If you want to build the more complex combined cycle generation systems They're talking about 2030, 20 32.”
Steve Piper Jul 31, 2025 ▶ 23:25 PJM and the capacity crunch

← every entity, every show

Made with StarZero

Turn any episode into a week of clips.

This entire site, thousands of episodes across every show transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.