The Ledger

Every statement that passed quotation and attribution checks. Mix any filter with any other: certainty 1/5, debate potential 5/5, or both at once.

clear all ✕

why aren't all 5 resolved? a statement only gets an assessment when the public record can support or contradict it. opinions and what-ifs never can, and 0 checkable ones are still open, waiting for their date. predictions held up or didn't; assertions are supported or contradicted. on every card: ▮▮▮▮▮ certainty · ▮▮▮▮▮ debate potential. speakers are clickable

Assertion Partly supported
Power: China built 1,700 vessels last year versus five by the US
“I mean, we're talking about like a quantum shipbuilding of like, I think it's 1700 last year of commercial and military vessels versus five.”
Chris Power Jul 18, 2025 ▶ 19:35 Inside Hadrian's $260M Series C to Advance Manufacturing in America · Sourcery with Molly O'Shea
Prediction Didn’t hold up
Power: Fed will cut rates close to 2021 ZERP levels within 12 months
“I think that we have so much headroom in the federal reserve rate, that I think we're going to see dramatic cuts close to twenty-twenty-one ZERP levels over the next 12 months.”
Chris Power Jul 18, 2025 ▶ 27:45 Inside Hadrian's $260M Series C to Advance Manufacturing in America · Sourcery with Molly O'Shea
Assertion Partly supported
Power: The US no longer manufactures antibiotics domestically
“We don't really make antibiotics onshore in the US anymore.”
Chris Power Jul 18, 2025 ▶ 10:16 Inside Hadrian's $260M Series C to Advance Manufacturing in America · Sourcery with Molly O'Shea
Assertion Contradicted
Power: Stripe and Google capped annual team headcount growth at exactly 30%
“Patrick Carlson from Stripe and also Eric Schmidt at Google basically had a hard and fast rule that you could only scale teams 30% a year without damaging the culture of the org.”
Chris Power Mar 29, 2024 ▶ 44:58 Get Tesla Big | Chris Power, Hadrian · Sourcery with Molly O'Shea
Prediction Didn’t hold up
Power: Hadrian will open its Arizona factory by Christmas
“So we're launching factory three in Arizona, which will be up and running in Christmas. We're in July, we signed the lease a couple of weeks ago, so it'll take us six months from start to finish to have it up and running, which I think is really fast.”
Chris Power Jul 18, 2025 ▶ 3:47 Inside Hadrian's $260M Series C to Advance Manufacturing in America · Sourcery with Molly O'Shea
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 160 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.