The Critical Path

also referred to as: critical path

1 statements across 1 episodes · 0 bullish · 0 bearish · 1 people on the record · first statement Apr 6, 2021 by Dr. Thomas Zurbuchen · across every show →

Everything said about The Critical Path, oldest first

Apr 6, 2021
Insight
Zurbuchen: Neglected Off-Critical-Path Items Cause Future Project Crises
“Everything off the critical path is what you're going to lose sleep over one year from now, if you're not watching it. And it's not that you divert attention from the critical path, but you also need to focus off the critical path and pattern match.”
Dr. Thomas Zurbuchen Apr 6, 2021 ▶ 1:03:30 #108 Thomas Zurbuchen: Adventures in Astrophysics
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 200 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.