The Ledger

Every statement that passed quotation and attribution checks. Mix any filter with any other: certainty 1/5, debate potential 5/5, or both at once.

clear all ✕

why aren't all 7 resolved? a statement only gets an assessment when the public record can support or contradict it. opinions and what-ifs never can, and 0 checkable ones are still open, waiting for their date. predictions held up or didn't; assertions are supported or contradicted. on every card: ▮▮▮▮▮ certainty · ▮▮▮▮▮ debate potential. speakers are clickable

Opinion
Frader-Thompson: Spending $20M on software before launching a VPP is backwards
“That is in contrast to some other plans that I've seen where we're saying like, let's build out twenty million dollars worth of software infrastructure before we even stand up a program, and that's backwards.”
Seth Frader-Thompson Mar 10, 2026 ▶ 15:36 Frontier Forum: How VPPs earn grid-scale trust [partner content]
Assertion Not checkable as stated
Frader-Thompson: Tens of thousands of events prove VPPs are 99.9% reliable
“Like, I can show you data from literally tens of thousands of events showing that this thing is 99.9 plus percent reliable.”
Seth Frader-Thompson Dec 2, 2024 ▶ 6:52 Frontier Forum: Why utilities should go big on VPPs
Insight
Frader-Thompson: VPPs need roughly 50 MW to interest utility control rooms
“I think scale is the other thing, right? I mean, I think Stacy talks about there being a threshold like somewhere around 50 megawatts where, you know, you are actually at the scale of a, an individual beaker plant, and that's kind of the that's kind of the hur…”
Seth Frader-Thompson Mar 10, 2026 ▶ 13:44 Frontier Forum: How VPPs earn grid-scale trust [partner content]
Assertion Not checkable as stated
Frader-Thompson: Regulators rely on one-size-fits-all M&V for flexible resources
“What we don't have in the industry right now is sort of regulatory recognition of those different things. We tend to have kind of a one-size-fits-all M&V approach.”
Seth Frader-Thompson Mar 10, 2026 ▶ 23:30 Frontier Forum: How VPPs earn grid-scale trust [partner content]
Prediction Not checkable as stated
Frader-Thompson: Virtual power plants will become continuous 24/7 operational grid resources
“And over time, that kind of creeps you toward what I think will be a 24, seven, three 65 kind of expectations of VPPs.”
Seth Frader-Thompson Dec 2, 2024 ▶ 9:35 Frontier Forum: Why utilities should go big on VPPs
Disclosure
Frader-Thompson: EnergyHub deployed ~120MW combining thermostats and batteries
“We just deployed about a 120 megawatts from kind of a traditional thermostat program layering in batteries. So we're sort of stacking up these resources to both firm the resource while growing it.”
Seth Frader-Thompson Mar 10, 2026 ▶ 1:45 Frontier Forum: How VPPs earn grid-scale trust [partner content]
Disclosure
Phillips: Duke Energy built a 45 MW battery VPP in 18 months
“Brought together the partnerships with aggregators like Energy Hub, as well as our local trade allies and other stakeholders who were interested in that. And 18 months later, we've got 45 megawatts of it, and it's a great program.”
Stacey Phillips Mar 10, 2026 ▶ 8:16 Frontier Forum: How VPPs earn grid-scale trust [partner content]
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 200 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.