Neha Palmer, CEO of Terawatt Infrastructure, discusses the Southern California air quality regulations accelerating commercial fleet electrification.
0:00 / 0:14exact quote · 14.3s
720p mp4 · rendered on demand · StarZero watermark
“In Southern California, you also have something called the wear rules, where non-zero-emission vehicles going in and out of warehouse hubs can start to incur fines for those warehouses, and so there is a push in the area for electrification, with the port kind of being”
quote is from the automated transcript, cleaned for reading:
filler sounds and stutters are removed, nothing is rephrased. names can be misheard
(the analysis reads context, assessments check outside sources). how →
More from Neha Palmer
PredictionNot checkable as stated
Terawatt CEO: Building EV charging network requires multiple billion-dollar raises
“The billion dollars is not gonna last that long to build that many assets, and so it was really the vision from the beginning that this is not just a small-scale effort, it's going to be something that requires significant capital, and they'll have to be multi…”
Palmer: Heavy transport electrification requires a trillion-dollar investment
“We know that this is a trillion dollar investment over years, and so the scale that we're talking about and the impact that we need to make even with a few sites is going to require lots of capital.”
Palmer: Rideshare operators find EVs cost-accretive in dense urban markets
“On the rideshare side, in dense urban markets where there's a lot of traffic, we're hearing from operators, it's cost-accretive for them to run EVs instead of traditional vehicles because of the fuel savings.”
Terawatt plans freight EV charging corridor from Long Beach to El Paso
“We call it kind of a corridor, but it would start in the port of Long Beach and go all the way to El Paso, Texas. And so allowing somebody in an EV truck to travel that Confidently, knowing that they had charging along the way that would accommodate the range …”
Palmer: Many foreign EV charger makers lack robust US spare parts programs
“Another piece is spare parts. It seems really simple that if you create chargers, you would have a full spare parts program, but that's not the case for all charger providers. Making sure that they had a robust program here in the US. Oftentimes you have charg…”
Palmer: Terawatt Secured Seven Megawatts of Immediate Power for Long Beach Site
“This site also had something really incredible where you don't find this in many locations, which is seven megawatts of power available from day one.”
This entire site, over 200 episodes transcribed, diarized, checked and made playable,
runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the
moments worth sharing, cuts them, captions them, and reframes them for every feed.
We use essential cookies to make the site work. With your permission we
also use analytics cookies (Google Analytics and Mixpanel) to understand
usage and improve StarZero. See our Cookie Policy.