Sivaram: Grid Interconnection Studies Test Data Centers Against 10-Year Worst-Case Peaks
Varun Sivaram · The mechanics of data center flexibility · Aug 28, 2025 · at 7:25
Emerald AI CEO Varun Sivaram details how transmission grid operators evaluate data center interconnection requests and determine whether system upgrades are required.
“When you're running a This interconnection study to determine, can this data center connect to my system? You're saying in the next seven or 10 years, in an absolute worst case scenario, so not just 87 60, but 87 60 times 10 87,600 hours when a transmission line goes down somewhere and it's a record hot day and air conditioning demand is super high, on that particular day, will my 400 megawatt data center request its full 400 megawatts and overload a circuit? And if so, Can't connect it today. Have to upgrade the system before we do that. So that's how data centers are studied today.”
quote is from the automated transcript, cleaned for reading: filler sounds and stutters are removed, nothing is rephrased. names can be misheard (the analysis reads context, assessments check outside sources). how →