Opinion certainty 4/5 debate potential 4/5

Frader-Thompson: California energy regulators are lagging behind other states on VPPs

Seth Frader-Thompson · Frontier Forum: Why utilities should go big on VPPs · Dec 2, 2024 · at 26:37

Seth Frader-Thompson, CEO of EnergyHub, addresses state energy regulators on adopting national best practices for virtual power plants.

0:00 / 0:09exact quote · 9.9s
720p mp4 · rendered on demand · StarZero watermark
“The one thing is I would say if you're in California and you're a regulator, the rest of the country exists. And if you look at what's going on, there are lots of examples of how you could be doing this a lot better.”

quote is from the automated transcript, cleaned for reading: filler sounds and stutters are removed, nothing is rephrased. names can be misheard (the analysis reads context, assessments check outside sources). how →

More from Seth Frader-Thompson

Opinion
Frader-Thompson: Spending $20M on software before launching a VPP is backwards
“That is in contrast to some other plans that I've seen where we're saying like, let's build out twenty million dollars worth of software infrastructure before we even stand up a program, and that's backwards.”
Seth Frader-Thompson Mar 10, 2026 ▶ 15:36 Frontier Forum: How VPPs earn grid-scale trust [partner content]
Opinion
EnergyHub CEO: Level 2 thermostat VPPs provide peaker plant value
“Like, the smart thermostat programs are at a strong level two in general. And at level two, like I said before, they are clearly already providing the value that a peaker plant would provide.”
Seth Frader-Thompson Mar 10, 2026 ▶ 28:08 Frontier Forum: How VPPs earn grid-scale trust [partner content]
Assertion Not checkable as stated
Frader-Thompson: Tens of thousands of events prove VPPs are 99.9% reliable
“Like, I can show you data from literally tens of thousands of events showing that this thing is 99.9 plus percent reliable.”
Seth Frader-Thompson Dec 2, 2024 ▶ 6:52 Frontier Forum: Why utilities should go big on VPPs
Prediction Not checkable as stated
Frader-Thompson: VPPs will be dispatched hundreds of times per year
“Now it's a resource because of that repeatability that you can use operationally, and you can be confident that if you need to use it, you know, today I think maybe dozens of times per year, but moving toward hundreds of times per year, that repeatability just…”
Seth Frader-Thompson Mar 10, 2026 ▶ 8:30 Frontier Forum: How VPPs earn grid-scale trust [partner content]
Insight
Frader-Thompson: VPPs need roughly 50 MW to interest utility control rooms
“I think scale is the other thing, right? I mean, I think Stacy talks about there being a threshold like somewhere around 50 megawatts where, you know, you are actually at the scale of a, an individual beaker plant, and that's kind of the that's kind of the hur…”
Seth Frader-Thompson Mar 10, 2026 ▶ 13:44 Frontier Forum: How VPPs earn grid-scale trust [partner content]
Assertion Not checkable as stated
Frader-Thompson: Regulators rely on one-size-fits-all M&V for flexible resources
“What we don't have in the industry right now is sort of regulatory recognition of those different things. We tend to have kind of a one-size-fits-all M&V approach.”
Seth Frader-Thompson Mar 10, 2026 ▶ 23:30 Frontier Forum: How VPPs earn grid-scale trust [partner content]
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 200 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.