“And now we're thinking from the outside in, we're saying, what does a power plant look like?
What value does it need to bring to the grid?
What does it need to do to be really effective and, you know, to meet the business goals of the operator and what do the batteries need to do that are going to do that?
And so you start at the power plant and then you move into your,
Power block or your enclosure, and then you move there into your module and you move from there into your cell.”
quote is from the automated transcript, cleaned for reading:
filler sounds and stutters are removed, nothing is rephrased. names can be misheard
(the analysis reads context, assessments check outside sources). how →
More from Tristan Doherty
AssertionNot checkable as stated
Nuclear and gas lead times make batteries the immediate grid solution
“Nukes are probably five or 10 or more years out. New gas generation. You can't get a new gas generator for probably four or six years at the very shortest. And so the most immediate and economical solution is really that those renewables and batteries.”
Tristan DohertyMay 20, 2025▶ 23:20A former race car engineer on battery safety and supply chains [partner content]
AssertionSupported
Doherty: Moss Landing fire spread after water suppression system failed
“What we do know is that mid-afternoon, January 16th, one of those modules went into thermal runaway. What we don't know yet is we don't have an official sort of answer on is for some reason that water system didn't work correctly. And that thermal runaway spre…”
Tristan DohertyMay 20, 2025▶ 5:11A former race car engineer on battery safety and supply chains [partner content]
AssertionSupported
Doherty: Battery storage failure rates dropped 97% from 2018 to 2023
“If you look at the number of failures and the failure rate from 2018 to 2023, it was just a five year span. That it dropped by 97%, and I think that's something that's really incredible and something to be really proud of.”
Tristan DohertyMay 20, 2025▶ 11:00A former race car engineer on battery safety and supply chains [partner content]
PredictionDidn’t hold up
LGES targets 100% non-Chinese storage components in Michigan by next year
“Right now, coming off of the Holland, Michigan line, we're on schedule for early next year to be a hundred percent non-Chinese in terms of all of the components and subcomponents that are going into those ESS cells.”
Tristan DohertyMay 20, 2025▶ 13:07A former race car engineer on battery safety and supply chains [partner content]
Disclosure
LG Energy Solution moved Arizona ESS production to Michigan to start faster
“Instead of taking three or four years to build a complete greenfield battery factory in Arizona, we could take six to 12 months, take an existing shell, an existing building that had all the permitting done, and had all the infrastructure and all the utilities…”
Tristan DohertyMay 20, 2025▶ 19:16A former race car engineer on battery safety and supply chains [partner content]
“Thankfully, all the environmental measurements that came back all of the EPA has been doing extensive testing all around the site. All those measurements have come back within sort of safe limits”
Tristan DohertyMay 20, 2025▶ 7:30A former race car engineer on battery safety and supply chains [partner content]
Made with StarZero
Turn any episode into a week of clips.
This entire site, over 200 episodes transcribed, diarized, checked and made playable,
runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the
moments worth sharing, cuts them, captions them, and reframes them for every feed.
We use essential cookies to make the site work. With your permission we
also use analytics cookies (Google Analytics and Mixpanel) to understand
usage and improve StarZero. See our Cookie Policy.