Meter Rollouts

topic on 1 show · 1 statements across 1 episodes

the Green Blueprint

1 statements about Meter Rollouts, every show

GREEN BLUEPRINT Assertion Supported
Lacey: Utility smart meter rollouts occur on 15-year procurement cycles
“These rollouts tend to happen on around 15 year cycles.”
Stephen Lacey Jun 25, 2024 ▶ 15:05 Avoiding mistakes from the first smart meters

← every entity, every show

Made with StarZero

Turn any episode into a week of clips.

This entire site, thousands of episodes across every show transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.