Fission Plant

topic on 1 show · 1 statements across 1 episodes

the Green Blueprint

1 statements about Fission Plant, every show

GREEN BLUEPRINT Assertion Not checkable as stated
Needham: Fusion plants can be licensed in 18 months for under $10M
“That means we can actually license a fusion power plant in like less than 18 months and less than ten million, as opposed to a fission plant Under 10 CFR, 50, 52, or 53, which is like five hundred million to a billion in 10 years, five to 10 years.”
Rick Needham Jun 18, 2025 ▶ 33:00 The tape that led to a fusion breakthrough

← every entity, every show

Made with StarZero

Turn any episode into a week of clips.

This entire site, thousands of episodes across every show transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.