ETU 1

product on 1 show · 1 statements across 1 episodes · said 3 times in 1 episodes since 2025

the Green Blueprint 3

Mentions by year, every show

tap a year for its mentions
0021312025episodesmentions
0112025episodes it came up in
001.50.5312025episodesmentions per episode

the Green Blueprint 3

2025 3 mentions in 1 episode

every mention on every show, scene by scene, with the transcript →

1 statements about ETU 1, every show

GREEN BLUEPRINT Assertion Not checkable as stated
On-site machining saved Kairos Power's schedule despite a distorted test vessel
“The fact that we had the machining capabilities on site allowed us to process nearly all the blocks with minor modifications to adapt to the as, basically, as-built geometry.”
Mike Laufer Sep 24, 2025 ▶ 28:36 Shortening the nuclear development cycle from decades to years

← every entity, every show

Made with StarZero

Turn any episode into a week of clips.

This entire site, thousands of episodes across every show transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.