Diamond Core Drilling

topic on 1 show · 1 statements across 1 episodes

TBPN

1 statements about Diamond Core Drilling, every show

TBPN Assertion Supported
Feldmann: Traditional drilling of a 1,000-foot hole takes 10 days
“So a good shift is about 50 feet in a day. And so 12 hours, 50 feet, a thousand foot hole, 20 shifts, 10 days.”
Ted Feldmann Apr 26, 2025 ▶ 12:49 What It Takes to Build a Mine | Ted Feldmann on TBPN

← every entity, every show

Made with StarZero

Turn any episode into a week of clips.

This entire site, thousands of episodes across every show transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.