transmission capacity

2 statements across 2 episodes · 1 bullish · 0 bearish · 2 people on the record · first statement May 1, 2023 by Will Hazlip · across every show →

Everything said about transmission capacity, oldest first

May 1, 2023 neutral
Prediction Open · timeframe Dec 2050
Hazlip: New York needs 20 GW of added transmission by 2050
“We see about 20 gigawatts of additional transmission capacity, you know, through to 20 50, both within and connecting New York to other regions.”
Will Hazlip May 1, 2023 ▶ 10:30 Creating the ‘energy capitals’ of a decarbonized grid [partner content]
Jul 16, 2024 bullish
Assertion Supported
Hamilton: Dynamic line ratings unlock 15% to 20% more transmission capacity
“So first of all, you get, like, just through dynamic line ratings, like, 15 to 20% more transmission capacity if you put dynamic line ratings in.”
Katherine Hamilton Jul 16, 2024 ▶ 19:13 Our final episode: The top stories of 2024 so far
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 100 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.