Goleta Energy Storage facility

1 statements across 1 episodes · 1 bullish · 0 bearish · 1 people on the record · first statement Jan 22, 2025 by Chris Taylor · across every show →

Everything said about Goleta Energy Storage facility, oldest first

Jan 22, 2025 positive
Assertion Not checkable as stated
Gridstor installed a Tesla Megapack every 2.5 minutes at construction peak
“I think we were installing a mega pack every two and a half minutes at the peak of construction. It's pretty incredible. That's how fast they were able to load them on. Maybe it was every five minutes, but they were able to like pick them off this truck with a…”
Chris Taylor Jan 22, 2025 ▶ 16:02 Pioneering one of the first IRA tax credit transfers
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 100 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.