Rippingham: Construction Workers Receive Massively Overbroad Plan Sets

Christopher Rippingham · a16z Podcast | Construction Under Tech -- The Build · Jan 2, 2019 · at 1:45

Christopher Rippingham, Technology and Innovation Leader at DPR Construction, discusses information flow and data delivery challenges on job sites.

0:00 / 0:10exact quote · 10.8s
▶ Watch the full episode on YouTube → 720p mp4 · rendered on demand · StarZero watermark
“Right now, we're basically giving an entire set of plans over to a construction worker in the field, and that could be thousands of pages of information that maybe only a handful, you know, a hundred pages are useful for that one specific person.”

quote is from the automated transcript, cleaned for reading: filler sounds and stutters are removed, nothing is rephrased. names can be misheard (the analysis reads context, assessments check outside sources). how →

More from Christopher Rippingham

Prediction Not checkable as stated
Rippingham: Daily Error Detection Can Halve Construction Rework Costs
“And so maybe if we're able to cut that 20 down into 10% because we've caught errors, you know, in a day instead of waiting two weeks to find out when the next trade is trying to install, and that can save us a lot of time, you know, cut down that rework.”
Christopher Rippingham Jan 2, 2019 ▶ 16:57 a16z Podcast | Construction Under Tech -- The Build
Opinion
Rippingham: OSHPD Stringency Drives High California Hospital Construction Costs
“They're the most stringent regulatory agency, I think, in the world, based on the seismic requirements for the state of California. That's why building hospitals has been so expensive in California for so long.”
Christopher Rippingham Jan 2, 2019 ▶ 32:07 a16z Podcast | Construction Under Tech -- The Build
Insight
Rippingham: Traditional Contracting Models Hinder Construction Site Trust
“The traditional design, bid, build atmosphere doesn't lend itself to that trust. But when you get towards integrated project delivery or design, build type contracts, there's a lot more trust that has to be established with the design team, and there's a lot m…”
Christopher Rippingham Jan 2, 2019 ▶ 4:08 a16z Podcast | Construction Under Tech -- The Build
Insight
Rippingham: Manually Comparing Installed Work to Models Adds No Value
“Going around and looking at a model to compare it against what was installed isn't necessarily a value-add task. If we can automate that, we can get the people that would be doing that job out in the field Solving more problems, working through more changes, m…”
Christopher Rippingham Jan 2, 2019 ▶ 29:13 a16z Podcast | Construction Under Tech -- The Build
Assertion Not checkable as stated
Rippingham: DPR Modeled Lab Project to 3/4-Inch Conduits for Prefabrication
“We modeled the entire job all the way down to, you know, three-quarter-inch conduits. So everything in the wall was modeled, everything above the ceiling was modeled. So that way everything was being fabricated offsite, and we have a lot of shared rack systems…”
Christopher Rippingham Jan 2, 2019 ▶ 18:34 a16z Podcast | Construction Under Tech -- The Build
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 1,000 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.