Christopher Rippingham, a leader at DPR Construction, discusses how automating routine site inspection enables field personnel to focus on high-value problem-solving.
“Going around and looking at a model to compare it against what was installed isn't necessarily a value-add task. If we can automate that, we can get the people that would be doing that job out in the field Solving more problems, working through more changes, making sure the owner's getting what they want”
quote is from the automated transcript, cleaned for reading:
filler sounds and stutters are removed, nothing is rephrased. names can be misheard
(the analysis reads context, assessments check outside sources). how →
More from Christopher Rippingham
PredictionNot checkable as stated
Rippingham: Daily Error Detection Can Halve Construction Rework Costs
“And so maybe if we're able to cut that 20 down into 10% because we've caught errors, you know, in a day instead of waiting two weeks to find out when the next trade is trying to install, and that can save us a lot of time, you know, cut down that rework.”
Christopher RippinghamJan 2, 2019▶ 16:57a16z Podcast | Construction Under Tech -- The Build
Opinion
Rippingham: OSHPD Stringency Drives High California Hospital Construction Costs
“They're the most stringent regulatory agency, I think, in the world, based on the seismic requirements for the state of California. That's why building hospitals has been so expensive in California for so long.”
Christopher RippinghamJan 2, 2019▶ 32:07a16z Podcast | Construction Under Tech -- The Build
AssertionNot checkable as stated
Rippingham: Construction Workers Receive Massively Overbroad Plan Sets
“Right now, we're basically giving an entire set of plans over to a construction worker in the field, and that could be thousands of pages of information that maybe only a handful, you know, a hundred pages are useful for that one specific person.”
Christopher RippinghamJan 2, 2019▶ 1:45a16z Podcast | Construction Under Tech -- The Build
Insight
Rippingham: Traditional Contracting Models Hinder Construction Site Trust
“The traditional design, bid, build atmosphere doesn't lend itself to that trust. But when you get towards integrated project delivery or design, build type contracts, there's a lot more trust that has to be established with the design team, and there's a lot m…”
Christopher RippinghamJan 2, 2019▶ 4:08a16z Podcast | Construction Under Tech -- The Build
AssertionNot checkable as stated
Rippingham: DPR Modeled Lab Project to 3/4-Inch Conduits for Prefabrication
“We modeled the entire job all the way down to, you know, three-quarter-inch conduits. So everything in the wall was modeled, everything above the ceiling was modeled. So that way everything was being fabricated offsite, and we have a lot of shared rack systems…”
Christopher RippinghamJan 2, 2019▶ 18:34a16z Podcast | Construction Under Tech -- The Build
Made with StarZero
Turn any episode into a week of clips.
This entire site, over 1,000 episodes transcribed, diarized, checked and made playable,
runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the
moments worth sharing, cuts them, captions them, and reframes them for every feed.
We use essential cookies to make the site work. With your permission we
also use analytics cookies (Google Analytics and Mixpanel) to understand
usage and improve StarZero. See our Cookie Policy.