Southern California Edison

1 statements across 1 episodes · 0 bullish · 1 bearish · 1 people on the record · first statement May 1, 2025 by Chris Power · said 2 times in 1 episodes since 2025 · across every show →

Mentions by year

brought up most by Bryon Hargis (2)

tap a year for its mentions
0011212025episodesmentions
0112025episodes it came up in
0010.5212025episodesmentions per episode
2025 2 mentions in 1 episode

every mention, scene by scene, with the transcript →

Everything said about Southern California Edison, oldest first

May 1, 2025 negative
Assertion Not checkable as stated
Hadrian waited months for Los Angeles power permits after fast construction
“Designed and launched the actual building and all the construction in three months, and then sat around waiting for permits and energy for six to nine months and probably had to put more documentation together to convince Southern California Edison to give me …”
Chris Power May 1, 2025 ▶ 6:02 How to Enable a Manufacturing Renaissance
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 1,000 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.