rework costs

2 statements across 1 episodes · 1 bullish · 0 bearish · 2 people on the record · first statement Jan 2, 2019 by Saurabh Ladha · across every show →

Everything said about rework costs, oldest first

Jan 2, 2019
Assertion Partly supported
Ladha: Rework Accounts for 20% of Total Construction Costs
“So, 20% of construction costs are usually reworked costs.”
Saurabh Ladha Jan 2, 2019 ▶ 15:27 a16z Podcast | Construction Under Tech -- The Build
Jan 2, 2019 bullish
Prediction Not checkable as stated
Rippingham: Daily Error Detection Can Halve Construction Rework Costs
“And so maybe if we're able to cut that 20 down into 10% because we've caught errors, you know, in a day instead of waiting two weeks to find out when the next trade is trying to install, and that can save us a lot of time, you know, cut down that rework.”
Christopher Rippingham Jan 2, 2019 ▶ 16:57 a16z Podcast | Construction Under Tech -- The Build
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 1,000 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.